[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":724},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,17,50,1361,[13,38,52,67,82,97,112,127,141,155,169,184,198,212,227,241,255,270,284,298,313,327,341,354,368,382,396,409,421,435,447,460,474,488,502,516,529,543,557,571,585,599,613,628,642,656,669,683,697,710],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1254220,2,"多选题","施工技术交底的内容，安全方面有（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","安全风险特点",true,{"key":24,"text":25,"correct":22},"B","安全防范措施",{"key":27,"text":28,"correct":22},"C","发生事故的应急预案",{"key":30,"text":31,"correct":32},"D","安全知识的掌握",false,{"key":34,"text":35,"correct":32},"E","特殊仪器仪表使用","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":36,"analysis":37},1254221,"安装工程成品保护的措施包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"包裹",{"key":24,"text":45,"correct":22},"覆盖",{"key":27,"text":47,"correct":22},"封闭",{"key":30,"text":49,"correct":32},"罚款",{"key":34,"text":51,"correct":32},"专人负责",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},1254222,"造成整改的原因是（ ）的因素影响了工程质量。",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"材料或成品",{"key":24,"text":59,"correct":32},"方法",{"key":27,"text":61,"correct":32},"设计",{"key":30,"text":63,"correct":32},"技术",{"key":34,"text":65,"correct":22},"人","AE",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1254223,"施工记录有哪两种类型（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"法规明确的，还有管理制度中明确的",{"key":24,"text":74,"correct":22},"主要在各专业施工规范或管理标准中规定的技术性施工记录",{"key":27,"text":76,"correct":32},"特殊作业施工记录",{"key":30,"text":78,"correct":32},"施工法规明确的",{"key":34,"text":80,"correct":32},"国家特殊规定","AB",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1254224,"通风与空调工程施工试验类记录有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":32},"风管的密闭性试验",{"key":24,"text":89,"correct":22},"整个系统联合调试和试运行试验",{"key":27,"text":91,"correct":32},"单体双机的措施试验",{"key":30,"text":93,"correct":32},"单体混合机的措施试验",{"key":34,"text":95,"correct":22},"单体单机的措施试验","BE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1254225,"支吊装的位置不设在（ ）等处。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"风口",{"key":24,"text":104,"correct":22},"风阀",{"key":27,"text":106,"correct":22},"检查口",{"key":30,"text":108,"correct":22},"自控机构",{"key":34,"text":110,"correct":32},"风口位置","ABCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1254226,"施工记录内容的质量要求包括（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"符合性",{"key":24,"text":119,"correct":22},"真实性",{"key":27,"text":121,"correct":22},"准确性",{"key":30,"text":123,"correct":22},"及时性",{"key":34,"text":125,"correct":22},"规范化","ABCDE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":36,"analysis":37},1254227,"影响工程质量的环境因素（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"工程技术环境",{"key":24,"text":134,"correct":22},"劳动环境",{"key":27,"text":136,"correct":22},"工程管理环境",{"key":30,"text":138,"correct":32},"工程施工环境",{"key":34,"text":140,"correct":32},"分项工程施工环境",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":154,"analysis":37},1254228,"施工项目质量管理的特点（ ）。",[145,147,149,150,152],{"key":20,"text":146,"correct":32},"贯彻科学、公正、守法的职业规范",{"key":24,"text":148,"correct":22},"影响质量的因素多",{"key":27,"text":146,"correct":32},{"key":30,"text":151,"correct":22},"容易产生质量变异",{"key":34,"text":153,"correct":22},"质量易受投资、进度制约","BDE",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":126,"analysis":37},1254229,"施工质量策划的结果包括（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"确定质量目标",{"key":24,"text":162,"correct":22},"建立管理组织机构",{"key":27,"text":164,"correct":22},"制定项目部各级部门和人员的职责",{"key":30,"text":166,"correct":22},"编制施工组织计划或质量计划",{"key":34,"text":168,"correct":22},"在企业通过认证的质量管理体系的基础上结合本项目实际情况，分析质量控制程序等有关资料是否需要补充和完善",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},1254230,"影响质量的因素控制包括（ ）。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"人的控制",{"key":24,"text":176,"correct":22},"材料控制",{"key":27,"text":178,"correct":22},"机械控制",{"key":30,"text":180,"correct":32},"器具控制",{"key":34,"text":182,"correct":22},"环境控制","ABCE",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":36,"analysis":37},1254231,"图纸变更的原因可能有（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"设计单位发现原设计不妥主动提出变更",{"key":24,"text":191,"correct":22},"业主或用户依据需要的变化提出变更",{"key":27,"text":193,"correct":22},"施工单位发现施工有问题而提出变更",{"key":30,"text":195,"correct":32},"图纸不符合相关规范要求",{"key":34,"text":197,"correct":32},"气候的变化引起的变动",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":111,"analysis":37},1254232,"图纸会审的主要内容包括（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"设计是否满足使用功能要求；图纸与说明是否齐全",{"key":24,"text":205,"correct":22},"图纸中有无遗漏、差错或相互矛盾之处，图纸表示方法是否清楚，是否符合标准",{"key":27,"text":207,"correct":22},"所需材料来源有无保证，能否替代；施工工艺、方法是否合理，是否切合实际，是否便于施工，能否保证质量要求",{"key":30,"text":209,"correct":22},"施工图及说明书中涉及的各种标准、图册、规范和规程等，施工单位是否具备相应资质",{"key":34,"text":211,"correct":32},"施工人员、材料、机械设备是否进场",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":226,"analysis":37},1254233,"项目技术交底的层级，分为三个层次：（ ）。",[216,218,220,222,224],{"key":20,"text":217,"correct":22},"施工组织设计的交底",{"key":24,"text":219,"correct":22},"施工方案的交底",{"key":27,"text":221,"correct":32},"单位工程交底",{"key":30,"text":223,"correct":32},"分部工程交底",{"key":34,"text":225,"correct":22},"分项工程交底","ABE",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":126,"analysis":37},1254234,"质量事故的处理程序包括（ ）。",[231,233,235,237,239],{"key":20,"text":232,"correct":22},"事故报告",{"key":24,"text":234,"correct":22},"现场保护",{"key":27,"text":236,"correct":22},"事故调查",{"key":30,"text":238,"correct":22},"编写质量事故调查报告",{"key":34,"text":240,"correct":22},"形成事故处理报告",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":36,"analysis":37},1254235,"施工准备的范围包括（ ）。",[245,247,249,251,253],{"key":20,"text":246,"correct":22},"项目开工前的施工准备",{"key":24,"text":248,"correct":22},"单位工程施工准备",{"key":27,"text":250,"correct":22},"分项工程施工准备",{"key":30,"text":252,"correct":32},"施工项目有方案准备",{"key":34,"text":254,"correct":32},"分部工程施工准备",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":269,"analysis":37},1254236,"施工作业中两大必须注意的环保事项是（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"消毒水的合理排放和有效处理",{"key":24,"text":262,"correct":32},"消毒水的有效制作",{"key":27,"text":264,"correct":32},"管网的密闭性",{"key":30,"text":266,"correct":22},"管网冲洗及中和的效果",{"key":34,"text":268,"correct":32},"管网设计","AD",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":126,"analysis":37},1254237,"属于ISO\u002FTC176整理并编撰八项质量管理原则（ ）。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"以顾客为关注焦点",{"key":24,"text":277,"correct":22},"领导作用",{"key":27,"text":279,"correct":22},"全员参与",{"key":30,"text":281,"correct":22},"过程方法",{"key":34,"text":283,"correct":22},"基于事实的决策方法",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":81,"analysis":37},1254238,"质量控制的依据包括（ ）。",[288,290,292,294,296],{"key":20,"text":289,"correct":22},"有关质量管理方面的法律、法规",{"key":24,"text":291,"correct":22},"施工质量验收规范",{"key":27,"text":293,"correct":32},"项目组织机构",{"key":30,"text":295,"correct":32},"监理业主口头通知",{"key":34,"text":297,"correct":32},"项目招标文件",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":312,"analysis":37},1254239,"工程质量控制包括（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":32},"预算质量控制",{"key":24,"text":305,"correct":22},"事前质量控制",{"key":27,"text":307,"correct":22},"事中质量控制",{"key":30,"text":309,"correct":22},"事后质量控制",{"key":34,"text":311,"correct":32},"设计质量控制","BCD",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":36,"analysis":37},1254240,"工序质量控制的方法一般有（ ）。",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"质量预控",{"key":24,"text":320,"correct":22},"工序分析",{"key":27,"text":322,"correct":22},"工序质量检验",{"key":30,"text":324,"correct":32},"质量通病预防",{"key":34,"text":326,"correct":32},"成品保护",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":111,"analysis":37},1254241,"事后质量控制指在完成施工过程形成产品的质量控制，其具体工作内容有（ ）。",[331,333,335,337,339],{"key":20,"text":332,"correct":22},"组织试运行和联动试车",{"key":24,"text":334,"correct":22},"整理竣工验收资料，组织自检和初步验收",{"key":27,"text":336,"correct":22},"按规定的质量评定标准和办法，对完成的分项、分部工程、单位工程进行质量评定",{"key":30,"text":338,"correct":22},"组织竣工验收",{"key":34,"text":340,"correct":32},"制定质量方针和质量目标",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":226,"analysis":37},1254242,"施工项目质量管理的原则（ ）。",[345,347,349,351,352],{"key":20,"text":346,"correct":22},"坚持质量第一，用户至上",{"key":24,"text":348,"correct":22},"一人为核心",{"key":27,"text":350,"correct":32},"质量检查不能解体、拆卸",{"key":30,"text":153,"correct":32},{"key":34,"text":353,"correct":22},"以预防为主",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":111,"analysis":37},1254243,"当前提倡技能环保和绿色施工，所以技术交底时要注意（ ）。",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"保护好作业环境",{"key":24,"text":361,"correct":22},"环保要求",{"key":27,"text":363,"correct":22},"妥善处理作业中产生的固体废弃物",{"key":30,"text":365,"correct":22},"防止废气、噪声、强光的污染",{"key":34,"text":367,"correct":32},"做好施工安全设施",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":111,"analysis":37},1254244,"案例一从背景分析项目部质量策划达到哪些（ ）目的。",[372,374,376,378,380],{"key":20,"text":373,"correct":22},"质量策划有效",{"key":24,"text":375,"correct":22},"质量目标和组织结构有明显的成果",{"key":27,"text":377,"correct":22},"落实责任和编制具有可操控性的质量计划有明显的成果",{"key":30,"text":379,"correct":22},"完善质量管理体系有明显的成果",{"key":34,"text":381,"correct":32},"更换应用设备",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":111,"analysis":37},1254246,"与建筑电气工程施工有关的试验记录包括（ ）。",[386,388,390,392,394],{"key":20,"text":387,"correct":22},"绝缘电阻测试记录",{"key":24,"text":389,"correct":22},"接地电阻测试记录",{"key":27,"text":391,"correct":22},"变配电设备检查通电满负荷测试记录",{"key":30,"text":393,"correct":22},"电气照明动力系统调试试运行记录",{"key":34,"text":395,"correct":32},"空调动力系统调试试运行记录",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":111,"analysis":37},1254247,"施工技术交底的内容，技术方面有（ ）。",[400,402,404,406,407],{"key":20,"text":401,"correct":22},"施工工艺和方法",{"key":24,"text":403,"correct":22},"技术手段",{"key":27,"text":405,"correct":22},"质量要求",{"key":30,"text":35,"correct":22},{"key":34,"text":408,"correct":32},"特殊人员培训",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":36,"analysis":37},1254248,"确定质量控制点的基础有（ ）。",[413,415,417,419,420],{"key":20,"text":414,"correct":22},"按掌握的基础知识，区分各专业的施工工艺流程",{"key":24,"text":416,"correct":22},"熟悉工艺技术规律，熟悉依次作业顺序，能区分可并行工作的作业活动",{"key":27,"text":418,"correct":22},"能进行工序质量控制，明确控制的内容和重点",{"key":30,"text":166,"correct":32},{"key":34,"text":168,"correct":32},{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":111,"analysis":37},1254249,"对于工程质量缺陷，可采用以下哪些处理方案（ ）。",[425,427,429,431,433],{"key":20,"text":426,"correct":22},"修补处理",{"key":24,"text":428,"correct":22},"返工处理",{"key":27,"text":430,"correct":22},"限制使用",{"key":30,"text":432,"correct":22},"不做处理",{"key":34,"text":434,"correct":32},"停工处理",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":111,"analysis":37},1254250,"影响施工项目质量的因素有（ ）。",[439,441,443,445,446],{"key":20,"text":440,"correct":22},"方法和环境",{"key":24,"text":442,"correct":22},"材料",{"key":27,"text":444,"correct":22},"机械",{"key":30,"text":65,"correct":22},{"key":34,"text":63,"correct":32},{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":312,"analysis":37},1254251,"质量预控方案一般包括：（ ）三部分内容。",[451,452,454,456,458],{"key":20,"text":320,"correct":32},{"key":24,"text":453,"correct":22},"工序名称",{"key":27,"text":455,"correct":22},"可能出现的质量问题",{"key":30,"text":457,"correct":22},"提出质量预控措施",{"key":34,"text":459,"correct":32},"采取质量预控措施予以预防",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":473,"analysis":37},1254252,"风管就位时，风管、部件、风阀等的排序应符合设计要求与自行测绘编制的草图，注意（ ）。",[464,466,468,470,472],{"key":20,"text":465,"correct":32},"风口大小",{"key":24,"text":467,"correct":22},"核对标高和与建筑物的距离",{"key":27,"text":469,"correct":22},"控制走向误差",{"key":30,"text":471,"correct":32},"风量控制",{"key":34,"text":110,"correct":22},"BCE",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":81,"analysis":37},1254253,"考虑（ ）方面的技术风险。",[478,480,482,484,486],{"key":20,"text":479,"correct":22},"管道试压因内力作用而引起管道移位的风险",{"key":24,"text":481,"correct":22},"同时也对工作环境特殊、在地沟内对用水量大的管道试压如发生漏水而产生危害的风险做出了有效的防范",{"key":27,"text":483,"correct":32},"管道的压力极限范围测定",{"key":30,"text":485,"correct":32},"管道的质地影响",{"key":34,"text":487,"correct":32},"管道的埋深",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":473,"analysis":37},1254254,"现场进行质量检查的方法主要有（ ）。",[492,494,496,498,500],{"key":20,"text":493,"correct":32},"经验法",{"key":24,"text":495,"correct":22},"目测法",{"key":27,"text":497,"correct":22},"实测法",{"key":30,"text":499,"correct":32},"计数法",{"key":34,"text":501,"correct":22},"试验法",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":515,"analysis":37},1254255,"产品质量具有相对性表现在（ ）。",[506,508,510,512,514],{"key":20,"text":507,"correct":32},"产品本身具有许多性质",{"key":24,"text":509,"correct":22},"对有关产品所规定的要求及标准、规定等因时而异，会随时间，条件而变化",{"key":27,"text":511,"correct":22},"满足期望的程度由于用户需求程度不同，因人而异",{"key":30,"text":513,"correct":32},"人的选择性",{"key":34,"text":340,"correct":32},"BC",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":183,"analysis":37},1254256,"在质量方面指挥、控制、组织和协调的活动，通常包括（ ）。",[520,521,523,525,527],{"key":20,"text":340,"correct":22},{"key":24,"text":522,"correct":22},"质量策划",{"key":27,"text":524,"correct":22},"质量控制",{"key":30,"text":526,"correct":32},"质量好坏",{"key":34,"text":528,"correct":22},"质量改进",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":36,"analysis":37},1254257,"以下哪些属于特殊过程：（ ）。",[533,535,537,539,541],{"key":20,"text":534,"correct":22},"特殊部件或部位焊接",{"key":24,"text":536,"correct":22},"热处理",{"key":27,"text":538,"correct":22},"高强度螺栓连接",{"key":30,"text":540,"correct":32},"洁具安装",{"key":34,"text":542,"correct":32},"吊装",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":473,"analysis":37},1254258,"项目部应针对容易发生质量通病的分部分项工程（ ）。",[547,549,551,553,555],{"key":20,"text":548,"correct":32},"图纸会审",{"key":24,"text":550,"correct":22},"编制作业指导书",{"key":27,"text":552,"correct":22},"进行技术交底",{"key":30,"text":554,"correct":32},"技术复核",{"key":34,"text":556,"correct":22},"必要时先行样板施工",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":183,"analysis":37},1254259,"消火栓箱内消火栓安装质量的控制点有（ ）。",[561,563,565,567,569],{"key":20,"text":562,"correct":22},"消火栓栓口的方向",{"key":24,"text":564,"correct":22},"与箱门轴的相对位置",{"key":27,"text":566,"correct":22},"栓口中心距地面的高度",{"key":30,"text":568,"correct":32},"阀门尺寸",{"key":34,"text":570,"correct":22},"阀门中心距箱侧面和距箱后内表面的距离",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":36,"analysis":37},1254260,"技术交底的实施包括（ ）。",[575,577,579,581,583],{"key":20,"text":576,"correct":22},"技术交底的准备",{"key":24,"text":578,"correct":22},"技术交底文件归档",{"key":27,"text":580,"correct":22},"技术交底记录",{"key":30,"text":582,"correct":32},"技术交底计划",{"key":34,"text":584,"correct":32},"技术交底的规划管理",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":111,"analysis":37},1254261,"现场质量检查的内容（ ）。",[589,591,593,595,597],{"key":20,"text":590,"correct":22},"工序交接检查",{"key":24,"text":592,"correct":22},"开工前检查",{"key":27,"text":594,"correct":22},"隐蔽工程检查",{"key":30,"text":596,"correct":22},"停工后复工前的检查",{"key":34,"text":598,"correct":32},"图纸会审有记录",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":111,"analysis":37},1254262,"工艺方法是影响施工质量的重要因素，包括施工项目建设期内所采取的（ ）。",[603,605,607,609,611],{"key":20,"text":604,"correct":22},"技术方案",{"key":24,"text":606,"correct":22},"工艺流程",{"key":27,"text":608,"correct":22},"检测手段",{"key":30,"text":610,"correct":22},"施工组织设计",{"key":34,"text":612,"correct":32},"验收标准",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":627,"analysis":37},1254263,"某医院医技综合楼机电总承包工程，具体工作范围包括给排水、电气、暖通空调、消防、智能、净化、医疗气体工程。大楼管线系统复杂，质量要求高，项目部为搞好工程质量，保证施工进度安全等各项指标的实现，在项目开工前进行了详细的质量策划、制定质量控制点、组织质量交底、技术交底，有效实现了项目的各项指标。根据背景资料，回答下列问题。 质量交底文件的内容包括（ ）。",[617,619,621,623,625],{"key":20,"text":618,"correct":32},"具体的施工工艺流程及操作方法",{"key":24,"text":620,"correct":22},"采用的标准和规范",{"key":27,"text":622,"correct":22},"具体的工序质量要求（含检测的数据和观感质量）",{"key":30,"text":624,"correct":22},"检测的方法、检测的仪器、仪表及其精度等级",{"key":34,"text":626,"correct":22},"检测时的环境条件","BCDE",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":36,"analysis":37},1254264,"整个系统联合调试和试运行试验包括（ ）。",[632,634,636,638,640],{"key":20,"text":633,"correct":22},"空载试运行",{"key":24,"text":635,"correct":22},"有载试运行",{"key":27,"text":637,"correct":22},"满负荷试运行",{"key":30,"text":639,"correct":32},"变负荷试运行",{"key":34,"text":641,"correct":32},"90%负荷试运行",{"id":643,"libraryId":5,"type":15,"typeLabel":16,"stem":644,"options":645,"answer":111,"analysis":37},1254265,"《建筑工程施工质量验收统一标准》将建筑工程质量验收划分为（ ）几个部分。",[646,648,650,652,654],{"key":20,"text":647,"correct":22},"检验批",{"key":24,"text":649,"correct":22},"分部（子分部）",{"key":27,"text":651,"correct":22},"分项",{"key":30,"text":653,"correct":22},"单位（子单位）",{"key":34,"text":655,"correct":32},"沉降缝",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":36,"analysis":37},1254266,"使用液氯钢瓶氯气制备消毒水有（ ）安全防范措施。",[660,662,664,666,668],{"key":20,"text":661,"correct":22},"防止氯气外泄伤人",{"key":24,"text":663,"correct":22},"同时要给作业人员配备口罩甚至防毒面具",{"key":27,"text":665,"correct":22},"作业部位要通风良好",{"key":30,"text":667,"correct":32},"制作时液氯钢制氯气阀门开小",{"key":34,"text":264,"correct":32},{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":111,"analysis":37},1254267,"关键过程是指（ ）。",[673,675,677,679,681],{"key":20,"text":674,"correct":22},"施工难度大、过程质量不稳定或出现不合格频率较高的过程",{"key":24,"text":676,"correct":22},"对产品质量特性有较大影响的过程",{"key":27,"text":678,"correct":22},"施工周期长，原材料昂贵，出现不合格品后经济损失较大的过程",{"key":30,"text":680,"correct":22},"基于人员素质、施工环境等方面的考虑，认为比较重要的其他过程",{"key":34,"text":682,"correct":32},"项目主要环节的施工过程",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":36,"analysis":37},1254268,"机械设备的选用，应着重从（ ）予以控制。",[687,689,691,693,695],{"key":20,"text":688,"correct":22},"选型",{"key":24,"text":690,"correct":22},"主要性能参数",{"key":27,"text":692,"correct":22},"使用操作要求",{"key":30,"text":694,"correct":32},"重量",{"key":34,"text":696,"correct":32},"体积",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":111,"analysis":37},1254269,"案例二技术交底时要关注的指标有（ ）。",[701,703,705,707,709],{"key":20,"text":702,"correct":22},"管网中和清洗",{"key":24,"text":704,"correct":22},"消毒水中氯的浓度",{"key":27,"text":706,"correct":22},"浸泡的时间",{"key":30,"text":708,"correct":22},"化验时菌落数总量",{"key":34,"text":268,"correct":32},{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":111,"analysis":37},1254270,"施工记录是（ ）。",[714,716,718,720,722],{"key":20,"text":715,"correct":22},"工程使用维护和改造扩建的重要基础资料",{"key":24,"text":717,"correct":22},"评定工程质量的依据",{"key":27,"text":719,"correct":22},"竣工结算审核的依据",{"key":30,"text":721,"correct":22},"厘清责任的佐证",{"key":34,"text":723,"correct":32},"施工的参考依据",[725,729,732,735,738,741],{"id":726,"name":727,"category":7,"favorite":728},1,"领导干部任职前廉政法规知识测试题",92,{"id":730,"name":731,"category":7,"favorite":726},595,"建筑结构与设备",{"id":733,"name":734,"category":7,"favorite":726},715,"招标采购专业知识与法律法规",{"id":736,"name":737,"category":7,"favorite":726},848,"市政方向-通用基础",{"id":739,"name":740,"category":7,"favorite":8},534,"BIM工程师",{"id":742,"name":740,"category":7,"favorite":8},535]