[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":696},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,16,50,1361,[13,38,53,68,83,98,112,127,142,156,171,185,198,212,224,239,253,266,280,294,307,321,332,346,360,373,388,399,413,427,441,451,465,479,490,505,516,528,542,556,570,584,598,609,622,634,648,663,675,685],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1254170,2,"多选题","常用的施工组织方法有（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","依次施工",true,{"key":24,"text":25,"correct":22},"B","平行施工",{"key":27,"text":28,"correct":29},"C","顺序施工",false,{"key":31,"text":32,"correct":22},"D","流水施工",{"key":34,"text":35,"correct":29},"E","方位施工","ABD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1254171,"施工组织设计的编制依据（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"与工程建设有关的法律、法规和文件",{"key":24,"text":45,"correct":22},"工程设计文件",{"key":27,"text":47,"correct":22},"国家现行有关标准",{"key":31,"text":49,"correct":22},"工程施工合同、招标投标文件或相关协议",{"key":34,"text":51,"correct":22},"技术经济指标","ABCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1254172,"下列有关防雷接地焊接搭接要求的说法中，正确的是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"圆钢的搭接长度应不小于其直径的6倍（当直径不同时以直径大的为准），单面施焊连接",{"key":24,"text":60,"correct":22},"扁钢的搭接长度应不小于其宽度的2倍（当扁钢宽度不同时，以宽度大的为准），三面施焊连接",{"key":27,"text":62,"correct":29},"圆钢与扁钢连接时其搭接长度应不小于圆钢直径的6倍，单面施焊连接",{"key":31,"text":64,"correct":22},"扁钢与钢管或角钢焊接时，除应在其接触部位两侧进行焊接外，并应焊以由扁钢弯成的弧形面（或直角形）与钢管，或角钢焊接",{"key":34,"text":66,"correct":22},"焊接处焊接饱满并有足够的机械强度，不得有咬肉、裂纹、虚焊、气孔等缺陷、焊接处的药皮敲净后刷沥青作防腐处理","BDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1254173,"下列有关施工段的说法，正确的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"在固定施工段的情况下，所有施工过程都采用同样的施工段，施工段的分界对所有施工过程来说都是固定不变的",{"key":24,"text":75,"correct":29},"在固定施工段的情况下，所有施工过程都采用同样的施工段，单施工段的分界对所有施工过程来说都是不同的",{"key":27,"text":77,"correct":22},"在不固定施工段的情况下，对不同的施工过程分别地规定出一种施工段划分方法，施工段的分界对于不同的施工过程是不同的",{"key":31,"text":79,"correct":29},"在不固定施工段的情况下，对不同的施工过程分别地规定出一种施工段划分方法，但施工段的分界对于不同的施工过程是固定不变的",{"key":34,"text":81,"correct":22},"固定的施工段便于组织流水施工，采用较广，而不固定的施工段则较少采用","ACE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1254174,"主要的施工方法包括（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"主要施工机械的选配、季节性施工的步骤",{"key":24,"text":90,"correct":22},"防台防雨措施、构件配件的加工订货",{"key":27,"text":92,"correct":22},"重要分项工程施工工艺及工序的确定",{"key":31,"text":94,"correct":22},"样板区的选定",{"key":34,"text":96,"correct":29},"重要分部工程施工工艺及工序的确定","ABCD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":97,"analysis":37},1254175,"施工机械的选择方法有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"综合评分法",{"key":24,"text":105,"correct":22},"单位工程量成本比较法",{"key":27,"text":107,"correct":22},"界限时间比较法",{"key":31,"text":109,"correct":22},"折算费用法（等值成本法）",{"key":34,"text":111,"correct":29},"经验法",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1254176,"下列有关施工顺序的说法，正确的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"施工顺序有空间顺序和工种顺序之分",{"key":24,"text":119,"correct":22},"空间顺序是解决施工的流向，施工流向是由施工组织、缩短工期和保证施工质量三个方面的要求而决定的",{"key":27,"text":121,"correct":22},"工种顺序是解决工种之间在时间上的衔接关系，必须在满足施工工艺要求的前提下，尽可能地利用工作面，使按工艺规律的两个相邻工种在时间上合理地和最大程度地搭接起来，如组织流水施工，显得十分必要",{"key":31,"text":123,"correct":29},"工种顺序的安排要以空间顺序为基础，不能违反工艺规律",{"key":34,"text":125,"correct":22},"空间顺序的安排要以工种顺序为基础，不能违反工艺规律","ABCE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1254177,"对施工方案的比较的方法，重要性比较:（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":29},"比较不同方案对工程进度时间及其发生费用的大小",{"key":24,"text":134,"correct":22},"比较不同方案的社会效益",{"key":27,"text":136,"correct":22},"比较不同方案推广应用的价值",{"key":31,"text":138,"correct":29},"比较不同方案对施工产值增长率的贡献",{"key":34,"text":140,"correct":29},"比较不同方案实施的安全可靠性","BC",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":97,"analysis":37},1254178,"单位工程施工组织设计内容（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"工程概况",{"key":24,"text":149,"correct":22},"施工部署",{"key":27,"text":151,"correct":22},"施工进度计划",{"key":31,"text":153,"correct":22},"主要施工管理计划",{"key":34,"text":155,"correct":29},"施工要求",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1254179,"现场材料堆放场地应注意的事项有（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":29},"方便施工，避免或减少一次搬运",{"key":24,"text":163,"correct":22},"符合防火、防潮要求，便于保管和搬运",{"key":27,"text":165,"correct":22},"要不妨碍作业位置，避免料场迁移",{"key":31,"text":167,"correct":22},"码放整齐，便于识别，危险品单独存放",{"key":34,"text":169,"correct":22},"方便施工，避免或减少二次搬运","BCDE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":141,"analysis":37},1254180,"安装工程资源管理的特殊点主要表现在（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":29},"资源管理方面",{"key":24,"text":178,"correct":22},"人力资源方面",{"key":27,"text":180,"correct":22},"材料管理方面",{"key":31,"text":182,"correct":29},"方案设计方面",{"key":34,"text":184,"correct":29},"施工进度方面",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":197,"analysis":37},1254181,"施工组织设计的编制的流程（ ）。",[189,191,193,195,196],{"key":20,"text":190,"correct":22},"组织编制组，明确负责人",{"key":24,"text":192,"correct":22},"收集整理编制依据，并鉴别其完整性和真实性",{"key":27,"text":194,"correct":22},"编制组分工，并明确初稿完成时间",{"key":31,"text":49,"correct":29},{"key":34,"text":49,"correct":29},"ABC",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":97,"analysis":37},1254182,"确定各项管理体系的流程和措施包括（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"技术措施",{"key":24,"text":205,"correct":22},"质量保证措施",{"key":27,"text":207,"correct":22},"组织措施",{"key":31,"text":209,"correct":22},"安全施工措施",{"key":34,"text":211,"correct":29},"技术保障措施",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":170,"analysis":37},1254183,"专项施工方案的经济合理性比较，主要指（ ）。",[216,217,219,221,222],{"key":20,"text":136,"correct":29},{"key":24,"text":218,"correct":22},"比较不同方案的投资额度",{"key":27,"text":220,"correct":22},"比较不同方案对环境影响产生的损失",{"key":31,"text":132,"correct":22},{"key":34,"text":223,"correct":22},"比较不同方案的投资中发生的阶段用料或添置的施工机械可重复使用的程度",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":238,"analysis":37},1254184,"施工机械生产率的表示可分为（ ）。",[228,230,232,234,236],{"key":20,"text":229,"correct":29},"工作容量",{"key":24,"text":231,"correct":22},"理论生产率",{"key":27,"text":233,"correct":22},"技术生产率",{"key":31,"text":235,"correct":22},"实际生产率",{"key":34,"text":237,"correct":29},"计算生产率","BCD",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":197,"analysis":37},1254185,"室内自动喷水灭火、消火栓系统安装工程中，（ ）等系统组件，应在管网冲洗后安装，否则易在冲洗过程中导致损坏。",[243,245,247,249,251],{"key":20,"text":244,"correct":22},"水流指示器",{"key":24,"text":246,"correct":22},"报警阀组",{"key":27,"text":248,"correct":22},"节流减压装置",{"key":31,"text":250,"correct":29},"水泵",{"key":34,"text":252,"correct":29},"水箱",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":141,"analysis":37},1254186,"主要施工管理计划包括（ ）。",[257,259,261,263,265],{"key":20,"text":258,"correct":29},"绿色施工管理计划",{"key":24,"text":260,"correct":22},"质量管理计划",{"key":27,"text":262,"correct":22},"安全管理计划",{"key":31,"text":264,"correct":29},"防火保安管理计划",{"key":34,"text":262,"correct":29},{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":52,"analysis":37},1254187,"房屋建筑设备安装工程的专项施工方案编制的导向主要是指（ ）。",[270,272,274,276,278],{"key":20,"text":271,"correct":22},"施工安全风险较大",{"key":24,"text":273,"correct":22},"工程规模较大",{"key":27,"text":275,"correct":22},"施工难度较大",{"key":31,"text":277,"correct":22},"采用新材料",{"key":34,"text":279,"correct":22},"新工艺的分部或分项工程",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":97,"analysis":37},1254188,"有关施工总平面图设计的原则，下列说法正确的是（ ）。",[284,286,288,290,292],{"key":20,"text":285,"correct":22},"施工现场的排水设施应全面规划。排水沟的截面积及坡度应经计算确定，其设置不得妨碍交通",{"key":24,"text":287,"correct":22},"合理组织交通运输，减少二次搬运",{"key":27,"text":289,"correct":22},"施工区域的划分保持施工均衡、连续、有序",{"key":31,"text":291,"correct":22},"临时设施的布置应符合防洪排水、节能、环保、安全和消防等要求，尽量减少对周围已有设施的影响",{"key":34,"text":293,"correct":29},"合理安排，方便生产，有利施工。临时设施应方便生产和生活，办公区、生活区、生产区宜集中域设置，降低临时设施的建造费用",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":238,"analysis":37},1254189,"施工的流向是由（ ）三个方面的要求决定的。",[298,300,302,304,306],{"key":20,"text":299,"correct":29},"保证施工进度",{"key":24,"text":301,"correct":22},"施工组织",{"key":27,"text":303,"correct":22},"缩短工期",{"key":31,"text":305,"correct":22},"保证施工质量",{"key":34,"text":299,"correct":29},{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":97,"analysis":37},1254190,"下列有关施工组织设计的编制原则的说法，正确的是（ ）。",[311,313,315,317,319],{"key":20,"text":312,"correct":22},"积极开发、使用新技术和新工艺，推广应用新材料和新设备；提高施工的工业化程度；积极采用国内外先进的施工技术。",{"key":24,"text":314,"correct":22},"充分利用时间和空间，坚持科学的施工程序和合理的施工顺序，采用流水施工和网络计划等方法，提高施工的连续性和均衡性",{"key":27,"text":316,"correct":22},"科学配置资源，合理布置现场、实现文明施工，采取季节性施工措施，实现均衡施工，达到合理的经济技术指标",{"key":31,"text":318,"correct":22},"重视管理创新、技术创新、施工的目标创新，采取技术和管理措施，推广建筑节能和绿色施工",{"key":34,"text":320,"correct":29},"可以不考虑与质量、环境和职业健康安全三个管理体系有效结合",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":197,"analysis":37},1254191,"系统组件指的是（ ）。",[325,326,327,328,330],{"key":20,"text":244,"correct":22},{"key":24,"text":246,"correct":22},{"key":27,"text":248,"correct":22},{"key":31,"text":329,"correct":29},"泄水阀",{"key":34,"text":331,"correct":29},"管道",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":97,"analysis":37},1254192,"施工准备计划包括（ ）。",[336,338,340,342,344],{"key":20,"text":337,"correct":22},"技术准备",{"key":24,"text":339,"correct":22},"物资准备",{"key":27,"text":341,"correct":22},"劳动组织准备",{"key":31,"text":343,"correct":22},"施工现场准备",{"key":34,"text":345,"correct":29},"施工技术准备",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":141,"analysis":37},1254193,"施工进度计划的分类，按作用不同分类（ ）。",[350,352,354,356,358],{"key":20,"text":351,"correct":29},"分部分项工程施工进度计划",{"key":24,"text":353,"correct":22},"控制性进度计划",{"key":27,"text":355,"correct":22},"实施性作业计划",{"key":31,"text":357,"correct":29},"单位工程施工进度计划",{"key":34,"text":359,"correct":29},"施工方案",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":197,"analysis":37},1254194,"施工进度计划的分类，按机电工程类别分类有（ ）。",[364,366,368,370,371],{"key":20,"text":365,"correct":22},"给水排水工程进度计划",{"key":24,"text":367,"correct":22},"建筑电气工程进度计划",{"key":27,"text":369,"correct":22},"通风与空调工程进度计划",{"key":31,"text":355,"correct":29},{"key":34,"text":372,"correct":29},"J建筑电气工程",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":387,"analysis":37},1254195,"双代号网络图的基本要素有（ ）。",[377,379,381,383,385],{"key":20,"text":378,"correct":29},"工艺关系",{"key":24,"text":380,"correct":29},"组织关系",{"key":27,"text":382,"correct":22},"工作",{"key":31,"text":384,"correct":22},"节点",{"key":34,"text":386,"correct":22},"线路","CDE",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":197,"analysis":37},1254196,"网络图的三要素由（ ）基本要素组成。",[392,393,394,395,397],{"key":20,"text":382,"correct":22},{"key":24,"text":384,"correct":22},{"key":27,"text":386,"correct":22},{"key":31,"text":396,"correct":29},"驻点",{"key":34,"text":398,"correct":29},"直线",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":97,"analysis":37},1254197,"施工进度计划的分类，按指导施工时间长短分类（ ）。",[403,405,407,409,411],{"key":20,"text":404,"correct":22},"年度计划",{"key":24,"text":406,"correct":22},"季度计划",{"key":27,"text":408,"correct":22},"月度计划",{"key":31,"text":410,"correct":22},"旬或周计划",{"key":34,"text":412,"correct":29},"总计划",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":52,"analysis":37},1254198,"交底的内容包括（ ）。",[417,419,421,423,425],{"key":20,"text":418,"correct":22},"确定各专业间衔接部位和衔接时间",{"key":24,"text":420,"correct":22},"明确进度控制的重点",{"key":27,"text":422,"correct":22},"介绍安全技术措施要领",{"key":31,"text":424,"correct":22},"介绍该单位工程质量目标",{"key":34,"text":426,"correct":22},"交代资源供给状况",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":52,"analysis":37},1254199,"作业计划编制前要对（ ）等做充分的了解，并对执行中可能遇到的问题及其解决的途径提出对策，因而作业计划具有更强的可操作性。",[431,433,435,437,439],{"key":20,"text":432,"correct":22},"施工现场条件",{"key":24,"text":434,"correct":22},"人力资源配备和物资供应状况",{"key":27,"text":436,"correct":22},"作业面现状",{"key":31,"text":438,"correct":22},"技术能力情况",{"key":34,"text":440,"correct":22},"资金供给的可能性",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":197,"analysis":37},1254200,"根据工程规模来分，工程项目的进度计划可以分为（ ）。",[445,447,448,449,450],{"key":20,"text":446,"correct":22},"施工总进度计划",{"key":24,"text":357,"correct":22},{"key":27,"text":351,"correct":22},{"key":31,"text":353,"correct":29},{"key":34,"text":355,"correct":29},{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":197,"analysis":37},1254201,"施工项目进度控制的主要方法有（ ）。",[455,457,459,461,463],{"key":20,"text":456,"correct":22},"行政方法",{"key":24,"text":458,"correct":22},"经济方法",{"key":27,"text":460,"correct":22},"管理技术方法",{"key":31,"text":462,"correct":29},"夜间加班法",{"key":34,"text":464,"correct":29},"增加人员法",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":126,"analysis":37},1254202,"施工进度计划编制中应用（ ）方法或原则。",[469,471,473,475,477],{"key":20,"text":470,"correct":22},"循环原理",{"key":24,"text":472,"correct":22},"系统原理",{"key":27,"text":474,"correct":22},"动态控制原理",{"key":31,"text":476,"correct":29},"施工进度原理",{"key":34,"text":478,"correct":22},"信息反馈原理",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":489,"analysis":37},1254203,"进度控制受以下原理影响（ ）。",[483,484,485,487,488],{"key":20,"text":470,"correct":22},{"key":24,"text":472,"correct":22},{"key":27,"text":486,"correct":29},"静态控制原理",{"key":31,"text":478,"correct":22},{"key":34,"text":474,"correct":22},"ABDE",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":504,"analysis":37},1254204,"进度计划调整的方法有（ ）。",[494,496,498,500,502],{"key":20,"text":495,"correct":22},"压缩或延长工作持续时间",{"key":24,"text":497,"correct":22},"增强或减弱资源供应强度",{"key":27,"text":499,"correct":29},"施工组织管理不力",{"key":31,"text":501,"correct":29},"各专业分包单位不能如期履行分包合同",{"key":34,"text":503,"correct":22},"在不违反工艺规律的情况下改变专业或工序衔接关系","ABE",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":504,"analysis":37},1254205,"甲公司中标一高级写字楼机电工程，内容含给水排水工程、通风与空调工程、电气工程等多个专业分部工程，由于工程量大、工期紧，需要编制施工进度网络计划，充分利用公司资源，进行严密组织施工，才能满足工期需要。根据背景资料，回答下列问题。 本工程工期紧，如何组织施工显得尤为重要，常用施工组织方式为（ ）。",[509,510,511,513,515],{"key":20,"text":21,"correct":22},{"key":24,"text":32,"correct":22},{"key":27,"text":512,"correct":29},"垂直施",{"key":31,"text":514,"correct":29},"混合施工",{"key":34,"text":25,"correct":22},{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":97,"analysis":37},1254206,"施工项目进度控制的措施有（ ）。",[520,521,522,524,526],{"key":20,"text":207,"correct":22},{"key":24,"text":203,"correct":22},{"key":27,"text":523,"correct":22},"经济措施",{"key":31,"text":525,"correct":22},"合同措施",{"key":34,"text":527,"correct":29},"法律措施",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":170,"analysis":37},1254207,"网络图中，对比分析实际进度与计划进度的方法有（ ）。",[532,534,536,538,540],{"key":20,"text":533,"correct":29},"横道图比较法",{"key":24,"text":535,"correct":22},"前锋线比较法",{"key":27,"text":537,"correct":22},"S形曲线比较法",{"key":31,"text":539,"correct":22},"“香蕉”形曲线比较法",{"key":34,"text":541,"correct":22},"列表比较法",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":504,"analysis":37},1254208,"工程实体的形成应是（ ）。",[546,548,550,552,554],{"key":20,"text":547,"correct":22},"符合施工顺序",{"key":24,"text":549,"correct":22},"符合工艺规律",{"key":27,"text":551,"correct":29},"符合施工要求",{"key":31,"text":553,"correct":29},"符合施工进度",{"key":34,"text":555,"correct":22},"符合当前的科学技术水平",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":126,"analysis":37},1254209,"影响工程进度管理的因素主要有（ ）。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"业主",{"key":24,"text":563,"correct":22},"勘察设计单位",{"key":27,"text":565,"correct":22},"承包人",{"key":31,"text":567,"correct":29},"供应商",{"key":34,"text":569,"correct":22},"建设环境",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":126,"analysis":37},1254210,"下列有关作业计划的作用，说法正确的有（ ）。",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"施工作业进度计划是对单位工程进度计划目标分解后的计划，可按分项工程或工序为单元进行编制",{"key":24,"text":577,"correct":22},"作业计划编制前要对施工现场条件、作业面现状、人力资源配备、物资供应状况、技术能力情况和资金供给的可能性等做充分的了解，并对执行中可能遇到的问题及其解决的途径提出对策，因而作业计划具有更强的可操作性",{"key":27,"text":579,"correct":22},"作业计划编制时已充分考虑了工作间的衔接关系，客观地反映了施工顺序的安排，符合工艺技术规律",{"key":31,"text":581,"correct":29},"作业计划的表达单位应是形象进度的实物工程量，表达形式宜为网络图计划",{"key":34,"text":583,"correct":22},"作业进度计划分为月计划、旬（周）计划、日计划三个层次",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":387,"analysis":37},1254211,"施工进度计划实施前的交底包括（ ）。",[588,590,592,594,596],{"key":20,"text":589,"correct":29},"做好实时的实际进度统计，以便与计划对比，确定是否出现偏差，以供是否需调整作决策依据",{"key":24,"text":591,"correct":29},"统计实物工程量进度的同时，统计资源消耗量，便于积累经验和数据，为制订企业定额奠定基础、创造条件",{"key":27,"text":593,"correct":22},"如交底工作向企业组织，则参加的人员包括项目部的相关管理人员、作业队（组）长、分包方的有关人员",{"key":31,"text":595,"correct":22},"交底的内容包括明确进度控制的重点，交代资源供给状况，确定各专业间衔接部位和衔接时间，介绍安全技术措施要领，介绍该单位工程质量目标",{"key":34,"text":597,"correct":22},"为保证进度计划顺利实施，企业将采取的经济措施和组织措施同时做出说明，以求取得共识，并对各项技术经济指标作量化介绍，为签订承包责任书做好准备",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":197,"analysis":37},1254212,"施工进度计划的分类，按工程规模分类（ ）。",[602,603,604,605,607],{"key":20,"text":446,"correct":22},{"key":24,"text":357,"correct":22},{"key":27,"text":351,"correct":22},{"key":31,"text":606,"correct":29},"主项工程施工进度计划",{"key":34,"text":608,"correct":29},"分项工程施工进度计划",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":197,"analysis":37},1254213,"如交底工作由企业组织，则参加的人员包括（ ）。",[613,615,617,619,620],{"key":20,"text":614,"correct":22},"项目部的相关管理人员",{"key":24,"text":616,"correct":22},"作业队长",{"key":27,"text":618,"correct":22},"分包方的有关人员",{"key":31,"text":561,"correct":29},{"key":34,"text":621,"correct":29},"用户",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":504,"analysis":37},1254214,"影响安装工程进度的因素，建设项目外部包括（ ）。",[626,628,630,631,632],{"key":20,"text":627,"correct":22},"设备、材料供应商违约不能如期供货",{"key":24,"text":629,"correct":22},"水、电、气等能源供给单位不能如期接通供应",{"key":27,"text":499,"correct":29},{"key":31,"text":501,"correct":29},{"key":34,"text":633,"correct":22},"施工设计图纸不能按计划或施工设计作出重大修改",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":97,"analysis":37},1254215,"编制好的施工进度计划包括（ ）。",[638,640,642,644,646],{"key":20,"text":639,"correct":22},"人力资源",{"key":24,"text":641,"correct":22},"材料和工程设备",{"key":27,"text":643,"correct":22},"施工机械",{"key":31,"text":645,"correct":22},"施工技术和施工需要的资金",{"key":34,"text":647,"correct":29},"施工过程的各项措施",{"id":649,"libraryId":5,"type":15,"typeLabel":16,"stem":650,"options":651,"answer":662,"analysis":37},1254216,"进度计划的调整方法主要有（ ）。",[652,654,656,658,660],{"key":20,"text":653,"correct":22},"改变某些工作的逻辑关系",{"key":24,"text":655,"correct":22},"改变某些工作的持续时间",{"key":27,"text":657,"correct":29},"增加施工技术人员",{"key":31,"text":659,"correct":29},"增加材料设备",{"key":34,"text":661,"correct":29},"增加施工机械、机具","AB",{"id":664,"libraryId":5,"type":15,"typeLabel":16,"stem":665,"options":666,"answer":504,"analysis":37},1254217,"影响安装工程进度的因素，建设项目内部包括（ ）。",[667,669,671,673,674],{"key":20,"text":668,"correct":22},"土建工期的延误",{"key":24,"text":670,"correct":22},"业主资金不到位",{"key":27,"text":672,"correct":29},"意外事件的出现",{"key":31,"text":633,"correct":29},{"key":34,"text":501,"correct":22},{"id":676,"libraryId":5,"type":15,"typeLabel":16,"stem":677,"options":678,"answer":489,"analysis":37},1254218,"施工进度计划编制中应用的（ ）等方法或原则，同样适用于资源供给计划的编制，仅是侧重点各有不同。",[679,680,681,683,684],{"key":20,"text":470,"correct":22},{"key":24,"text":472,"correct":22},{"key":27,"text":682,"correct":29},"弹性原理",{"key":31,"text":474,"correct":22},{"key":34,"text":478,"correct":22},{"id":686,"libraryId":5,"type":15,"typeLabel":16,"stem":687,"options":688,"answer":197,"analysis":37},1254219,"网络图计划检查方法（ ）。",[689,690,691,692,694],{"key":20,"text":541,"correct":22},{"key":24,"text":535,"correct":22},{"key":27,"text":539,"correct":22},{"key":31,"text":693,"correct":29},"图表比较法",{"key":34,"text":695,"correct":29},"节点对比法",[697,701,704,707,710,713],{"id":698,"name":699,"category":7,"favorite":700},1,"领导干部任职前廉政法规知识测试题",92,{"id":702,"name":703,"category":7,"favorite":698},595,"建筑结构与设备",{"id":705,"name":706,"category":7,"favorite":698},715,"招标采购专业知识与法律法规",{"id":708,"name":709,"category":7,"favorite":698},848,"市政方向-通用基础",{"id":711,"name":712,"category":7,"favorite":8},534,"BIM工程师",{"id":714,"name":712,"category":7,"favorite":8},535]