[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":593},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,12,50,1361,[13,34,46,58,66,77,89,101,109,121,133,145,157,169,181,193,205,216,226,238,247,258,268,280,288,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,476,488,500,512,523,535,546,558,570,582],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1253970,1,"单选题","安全检查应注意将互查与自查有机结合起来，坚持检查和整改相结合，关注建立安全生产档案资料的收集，（ ）为保证的原则。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","常抓不懈",true,{"key":24,"text":25,"correct":26},"B","贯彻落实责任",false,{"key":28,"text":29,"correct":26},"C","强化管理",{"key":31,"text":32,"correct":26},"D","以人为本","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1253971,"每组二根接地体之间距离不小于（ ）m，埋地深度不小于（ ）m，接地电阻值满足规定要求。",[38,40,42,44],{"key":20,"text":39,"correct":26},"2.00.5",{"key":24,"text":41,"correct":26},"2.00.6",{"key":28,"text":43,"correct":26},"2.50.5",{"key":31,"text":45,"correct":22},"2.50.6",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1253972,"清除残余燃料的方法：对一般燃料容器，可用磷酸钠的水溶液仔细清洗，清洗时间为（ ）分钟。",[50,52,54,56],{"key":20,"text":51,"correct":26},"2～3",{"key":24,"text":53,"correct":26},"2～24",{"key":28,"text":55,"correct":22},"15～20",{"key":31,"text":57,"correct":26},"3～8",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1253973,"清除残余燃料的方法：清洗装过不溶于碱的矿物油容器时，1升水溶液中加（ ）克的水玻璃或肥皂。",[62,63,64,65],{"key":20,"text":51,"correct":22},{"key":24,"text":55,"correct":26},{"key":28,"text":53,"correct":26},{"key":31,"text":57,"correct":26},{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":20,"analysis":33},1253974,"深度在（ ）的桩孔与管道孔洞等边沿上的施工作业属于洞口作业。",[70,72,74,76],{"key":20,"text":71,"correct":22},"2m和2m以下",{"key":24,"text":73,"correct":26},"2m和2m以上",{"key":28,"text":75,"correct":26},"3m和3m以下",{"key":31,"text":73,"correct":26},{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":24,"analysis":33},1253975,"高度超过（ ）m的建筑物的周边，当无外脚手架时，应在外围边沿架设一道安全平网。",[81,83,85,87],{"key":20,"text":82,"correct":26},"2.3",{"key":24,"text":84,"correct":22},"3.2",{"key":28,"text":86,"correct":26},"2.4",{"key":31,"text":88,"correct":26},"2.1",{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":28,"analysis":33},1253976,"（ ）级以上大风、大雾、大雨和大雪天气应暂停在脚手架上作业。",[93,95,97,99],{"key":20,"text":94,"correct":26},"8",{"key":24,"text":96,"correct":26},"7",{"key":28,"text":98,"correct":22},"6",{"key":31,"text":100,"correct":26},"5",{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":28,"analysis":33},1253977,"清除残余燃料的方法：汽油容器的清洗是用蒸汽吹刷，吹刷时间一般为（ ）小时，根据容器大小决定。",[105,106,107,108],{"key":20,"text":51,"correct":26},{"key":24,"text":55,"correct":26},{"key":28,"text":53,"correct":22},{"key":31,"text":57,"correct":26},{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":28,"analysis":33},1253978,"为了充分利用和发挥信息资源的价值。实现有序的科学信息管理，项目参建备方都应编制各自的（ ），以规范信息管理工作。",[113,115,117,119],{"key":20,"text":114,"correct":26},"项目管理规划",{"key":24,"text":116,"correct":26},"系统开发计划",{"key":28,"text":118,"correct":22},"信息管理手册",{"key":31,"text":120,"correct":26},"信息编码表",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":31,"analysis":33},1253979,"在工程施工技术管理资料中，工程洽商是施工过程中一种协调业主与施工方、施工方和设计行为的记录。工程洽商分为技术洽商和经济洽商两种，通常情况下由（ ）提出。",[125,127,129,131],{"key":20,"text":126,"correct":26},"业主",{"key":24,"text":128,"correct":26},"设计单位",{"key":28,"text":130,"correct":26},"监理单位",{"key":31,"text":132,"correct":22},"施工单位",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":28,"analysis":33},1253980,"工程施工质量验收资料是建设工程施工全过程中按照国家现行的工程质量检验标准，对施工项目进行单位工程、分部工程、分项工程及检验批的划分，再由检验批、分项工程、分部工程、单位工程逐级对工程质量做出（ ）的工程质量验收资料。",[137,139,141,143],{"key":20,"text":138,"correct":26},"分级评定",{"key":24,"text":140,"correct":26},"综合评定",{"key":28,"text":142,"correct":22},"检验定级",{"key":31,"text":144,"correct":26},"验收评定",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":24,"analysis":33},1253981,"项目经理部通过动态的、高速度、高质量地处理大量项目施工及相关信息，和有组织的信息流通，实现项目管理（ ）。",[149,151,153,155],{"key":20,"text":150,"correct":26},"制度化",{"key":24,"text":152,"correct":22},"信息化",{"key":28,"text":154,"correct":26},"组织化",{"key":31,"text":156,"correct":26},"安全化",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":31,"analysis":33},1253982,"施工项目信息按信息的稳定程度分类分为固定信息和（ ）。",[161,163,165,167],{"key":20,"text":162,"correct":26},"执行信息",{"key":24,"text":164,"correct":26},"静态信息",{"key":28,"text":166,"correct":26},"动态信息",{"key":31,"text":168,"correct":22},"流动信息",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":31,"analysis":33},1253983,"施工项目信息按管理工作流程标分类分为计划信息、执行信息、检查信息和（ ）。",[173,175,177,179],{"key":20,"text":174,"correct":26},"战略信息",{"key":24,"text":176,"correct":26},"策略信息",{"key":28,"text":178,"correct":26},"业务信息",{"key":31,"text":180,"correct":22},"反馈信息",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":28,"analysis":33},1253984,"建设工程项目的实施需要人力资源和物质资源，应认识到（ ）资源也是项目实施的重要资源之一。",[185,187,189,191],{"key":20,"text":186,"correct":26},"成本",{"key":24,"text":188,"correct":26},"质量",{"key":28,"text":190,"correct":22},"信息",{"key":31,"text":192,"correct":26},"合同",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":28,"analysis":33},1253985,"以下信息中属于生产信息的有（ ）。①改进的办法②重大决策信息③施工进度计划④劳动力流动⑤材料消耗",[197,199,201,203],{"key":20,"text":198,"correct":26},"①②③",{"key":24,"text":200,"correct":26},"①②④⑤",{"key":28,"text":202,"correct":22},"③⑤",{"key":31,"text":204,"correct":26},"①②④",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":31,"analysis":33},1253986,"以下信息中属于技术信息的有（ ）。①施工方案②技术规范③施工项目成本计划④资金耗用⑤资金来源",[209,211,213,214],{"key":20,"text":210,"correct":26},"②③",{"key":24,"text":212,"correct":26},"③④⑤",{"key":28,"text":198,"correct":26},{"key":31,"text":215,"correct":22},"①②",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":28,"analysis":33},1253987,"建设工程项目的信息管理是通过对各个系统、各项工作和各种数据的管理，使项目的（ ）能方便和有效地获取、存储、存档、处理和交流。",[220,222,224,225],{"key":20,"text":221,"correct":26},"数据",{"key":24,"text":223,"correct":26},"图纸",{"key":28,"text":190,"correct":22},{"key":31,"text":186,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1253988,"由于建设工程项目大量数据处理的需要。在当今时代应重视利用信息技术的手段进行信息管理，其核心技术是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"施工图预算程序",{"key":24,"text":233,"correct":26},"项目管理系统",{"key":28,"text":235,"correct":22},"基于网络的信息处理平台",{"key":31,"text":237,"correct":26},"设施管理信息处理系统",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1253989,"竣工报告是指工程项目具备竣工条件后，施工单位向建设单位报告，提请（ ）组织竣工验收的文件。",[242,244,245,246],{"key":20,"text":243,"correct":26},"建设单位",{"key":24,"text":128,"correct":22},{"key":28,"text":130,"correct":26},{"key":31,"text":132,"correct":26},{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":28,"analysis":33},1253990,"工程项目信息管理的核心指导文件是（ ）。",[251,253,255,256],{"key":20,"text":252,"correct":26},"信息编码体系",{"key":24,"text":254,"correct":26},"信息分类标准",{"key":28,"text":118,"correct":22},{"key":31,"text":257,"correct":26},"信息处理方法",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":31,"analysis":33},1253991,"各项调整措施、意见、改进的办法和方案是（ ）信息。",[262,264,265,267],{"key":20,"text":263,"correct":26},"计划信息",{"key":24,"text":162,"correct":26},{"key":28,"text":266,"correct":26},"检查信息",{"key":31,"text":180,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":28,"analysis":33},1253992,"在工程施工技术管理资料中，工程竣工文件作为工程施工技术管理资料的一部分，应包括竣工报告、竣工验收证明书和（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":26},"隐蔽工程验收资料",{"key":24,"text":275,"correct":26},"工程施工质量验收资料",{"key":28,"text":277,"correct":22},"工程质量保修书",{"key":31,"text":279,"correct":26},"工程质量控制资料",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},1253993,"提供给上级领导的重大决策性信息称为（ ）。",[284,285,286,287],{"key":20,"text":176,"correct":26},{"key":24,"text":174,"correct":22},{"key":28,"text":178,"correct":26},{"key":31,"text":263,"correct":26},{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":20,"analysis":33},1253994,"以下信息中属于资源信息的有（ ）。①技术交底②成本统计报表③资金来源④劳动力供应⑤材料供应",[292,293,294,296],{"key":20,"text":212,"correct":22},{"key":24,"text":215,"correct":26},{"key":28,"text":295,"correct":26},"①③⑤",{"key":31,"text":297,"correct":26},"②④",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1253995,"特种设备压力管道，其范围规定最高工作压力大于或者等于（ ）MPa（表压）的流体，且公称直径大于（ ）mm的管道。",[302,304,306,308],{"key":20,"text":303,"correct":26},"0.225",{"key":24,"text":305,"correct":22},"0.125",{"key":28,"text":307,"correct":26},"0.220",{"key":31,"text":309,"correct":26},"0.120",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},1253996,"不属于编制专项工程方案的工程有（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"其他危险性较大的工程",{"key":24,"text":317,"correct":26},"起重吊装工程",{"key":28,"text":319,"correct":26},"拆除爆破工程",{"key":31,"text":321,"correct":22},"高大模板工程",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":31,"analysis":33},1253997,"安全规章制度日常管理的重点是（ ），确保得到贯彻落实。",[326,328,330,332],{"key":20,"text":327,"correct":26},"组织有关部门人员学习培训",{"key":24,"text":329,"correct":26},"对相关人员进行考试，合格后才能上岗",{"key":28,"text":331,"correct":26},"检查安全规章制度的宣传情况",{"key":31,"text":333,"correct":22},"在执行过程中的动态检查",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1253998,"环境管理体系是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":26},"IS019000",{"key":24,"text":341,"correct":22},"IS014000",{"key":28,"text":343,"correct":26},"IS028000",{"key":31,"text":345,"correct":26},"IS018000",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":28,"analysis":33},1253999,"开关箱与用电设备的水平距离不宜超过（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":26},"1m",{"key":24,"text":353,"correct":26},"2m",{"key":28,"text":355,"correct":22},"3m",{"key":31,"text":357,"correct":26},"4m",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},1254000,"不属于竣工验收提交的文件（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":26},"施工单位签署的工程质量保修书",{"key":24,"text":365,"correct":26},"法规、规章规定必须提供的其他文件",{"key":28,"text":367,"correct":26},"工程竣工验收报告",{"key":31,"text":369,"correct":22},"工程竣工条例",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},1254001,"安全教育的主要内容不包括（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":26},"安全生产思想教育",{"key":24,"text":377,"correct":26},"安全知识教育",{"key":28,"text":379,"correct":26},"安全技能教育",{"key":31,"text":381,"correct":22},"交通安全",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},1254002,"特种设备锅炉，其范围规定为容积大于或者等于（ ）L的承压蒸汽锅炉；出口水压大于或者等于（ ）MPa（表压），且额定功率大于或者等于（ ）MW的承压热水锅炉。",[386,388,390,392],{"key":20,"text":387,"correct":26},"300.20.1",{"key":24,"text":389,"correct":26},"300.10.2",{"key":28,"text":391,"correct":26},"200.10.1",{"key":31,"text":393,"correct":22},"300.10.1",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},1254003,"属于危险性较大的分部分项工程的安全管理（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"有专项的施工方案",{"key":24,"text":401,"correct":26},"带电调试作业",{"key":28,"text":403,"correct":26},"生活区的选址应符合安全性要求",{"key":31,"text":405,"correct":26},"正确使用安全防护用具和用品",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},1254004,"为防止风机、水泵等振动所采用的隔振、减振措施，同时可以起到降低或减少（ ）危害的作用。",[410,412,414,416],{"key":20,"text":411,"correct":26},"高温",{"key":24,"text":413,"correct":22},"噪声",{"key":28,"text":415,"correct":26},"碰撞",{"key":31,"text":417,"correct":26},"辐射",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1254005,"建筑工程质量验收共8条，强调（检验批验收合格）是基础，同时体现了质量控制资料在分部和单位工程验收时的重要作用。",[422,424,426,428],{"key":20,"text":423,"correct":22},"检验批验收合格",{"key":24,"text":425,"correct":26},"单位工程验收合格",{"key":28,"text":427,"correct":26},"分部工程验收合格",{"key":31,"text":429,"correct":26},"分项工程验收合格",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":28,"analysis":33},1254006,"工程项目应坚持逐级安全技术交底制度。以下说法错误的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":26},"工程开工前，应将工程概况、施工方法、安全技术措施等情况，向工地负责人、工班长进行详细交底",{"key":24,"text":437,"correct":26},"两个以上施工队或工种配合施工时，应按工程进度定期或不定期地向有关施工单位和班组进行交叉作业的安全书面交底",{"key":28,"text":439,"correct":22},"工程师每天工作前，必须跟项目经理进行书面的施工技术交底，必要时甚至向参加施工的全体员工进行交底",{"key":31,"text":441,"correct":26},"工长安排班组长工作前，必须进行书面的安全技术交底，班组长应每天对工人进行施工要求、作业环境等书面安全交底",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},1254007,"不属于房屋建筑安装工程施工安全措施的主要关注点（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":26},"高空作业",{"key":24,"text":449,"correct":26},"施工机械操作",{"key":28,"text":451,"correct":26},"动用明火作业",{"key":31,"text":453,"correct":22},"认真接受安全教育培训",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},1254008,"地基基础工程和主体结构工程，工程质量保修期限（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":26},"至少80年",{"key":24,"text":461,"correct":26},"之多90年",{"key":28,"text":463,"correct":26},"至少50年",{"key":31,"text":465,"correct":22},"为设计文件规定的该工程的合理使用年限",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},1254009,"备案机关发现建设单位在竣工验收过程中有违反国家有关建设工程质量管理规定行为的，应在收讫竣工验收备案文件（ ）日内，责令停止使用，重新组织竣工验收。",[470,471,473,475],{"key":20,"text":100,"correct":26},{"key":24,"text":472,"correct":22},"15",{"key":28,"text":474,"correct":26},"10",{"key":31,"text":94,"correct":26},{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},1254010,"设备安装工程施工，在（ ），应进行针对性的安全教育。",[480,482,484,486],{"key":20,"text":481,"correct":26},"上岗前",{"key":24,"text":483,"correct":26},"法定节假日前后",{"key":28,"text":485,"correct":22},"工作对象改变时",{"key":31,"text":487,"correct":26},"ABC",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},1254011,"安全带应（ ），注意防止（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"高挂低用摆动碰撞",{"key":24,"text":495,"correct":26},"高挂低用串联使用",{"key":28,"text":497,"correct":26},"高挂高用摆动使用",{"key":31,"text":499,"correct":26},"低挂低用摆动碰撞",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":28,"analysis":33},1254012,"特种设备起重机械，其范围规定的额定起重量大于或者等于（ ）t的升降机；额定起重量大于或者等于（ ）t，且提升高度大于或者等于（ ）m的起重机和承重形式固定的电动葫芦等。",[504,506,508,510],{"key":20,"text":505,"correct":26},"0.511",{"key":24,"text":507,"correct":26},"0.522",{"key":28,"text":509,"correct":22},"0.512",{"key":31,"text":511,"correct":26},"0.521",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":28,"analysis":33},1254013,"专项施工方案编制后要经过（ ）签字确认后实施。",[516,518,520,522],{"key":20,"text":517,"correct":26},"施工单位质量负责人和总监理工程师",{"key":24,"text":519,"correct":26},"施工单位技术负责人和监理工程师",{"key":28,"text":521,"correct":22},"施工单位技术负责人和总监理工程师",{"key":31,"text":517,"correct":26},{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":28,"analysis":33},1254014,"施工单位违反工程建设强制性标准的，责令改正，处工程合同价款（ ）的罚款。",[527,529,531,533],{"key":20,"text":528,"correct":26},"3%以上4%以下",{"key":24,"text":530,"correct":26},"2%以上3%以下",{"key":28,"text":532,"correct":22},"2%以上4%以下",{"key":31,"text":534,"correct":26},"3%以上5%以下",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1254015,"英里等于（ ）码，一码等于（ ）英尺，一英尺等于（ ）m。",[539,541,543,545],{"key":20,"text":540,"correct":22},"1760，3，0.3048",{"key":24,"text":542,"correct":26},"1670，3，0.3048",{"key":28,"text":544,"correct":26},"1760，2，0.3048",{"key":31,"text":542,"correct":26},{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":31,"analysis":33},1254016,"编制工程项目顶管施工组织设计方案，其中必须制订有针对性、实效性的（ ）。",[550,552,554,556],{"key":20,"text":551,"correct":26},"施工技术指标",{"key":24,"text":553,"correct":26},"施工进度计划",{"key":28,"text":555,"correct":26},"节约材料措施",{"key":31,"text":557,"correct":22},"安全技术措施和专项方案",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},1254017,"建筑企业的安全生产方针是（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":26},"加大惩罚力度",{"key":24,"text":565,"correct":22},"安全第一，预防为主，综合治理",{"key":28,"text":567,"correct":26},"综合治理",{"key":31,"text":569,"correct":26},"确保安全",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":28,"analysis":33},1254018,"属于建筑工程检测的目的（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":26},"对施工计划进行验证",{"key":24,"text":577,"correct":26},"参与建筑新结构、新技术、新产品的科技成果鉴定",{"key":28,"text":579,"correct":22},"保证建筑工程质量",{"key":31,"text":581,"correct":26},"加快施工进度",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},1254019,"供热与供冷系统，工程质量保修期限为（ ）个采暖期、供冷期。",[586,588,590,592],{"key":20,"text":587,"correct":22},"2",{"key":24,"text":589,"correct":26},"3",{"key":28,"text":591,"correct":26},"4",{"key":31,"text":100,"correct":26},[594,597,600,603,606,609],{"id":15,"name":595,"category":7,"favorite":596},"领导干部任职前廉政法规知识测试题",92,{"id":598,"name":599,"category":7,"favorite":15},595,"建筑结构与设备",{"id":601,"name":602,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":604,"name":605,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":607,"name":608,"category":7,"favorite":8},534,"BIM工程师",{"id":610,"name":608,"category":7,"favorite":8},535]