[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,10,50,1361,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,201,213,225,237,245,257,268,278,290,302,312,324,336,348,360,372,384,393,405,417,429,441,453,465,477,489,501,513,525,537,545,554,566,578,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1253870,1,"单选题","施工作业的安全管理重点不包括（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","带电调试作业",false,{"key":24,"text":25,"correct":22},"B","管道、设备的试压、冲洗、消毒作业",{"key":27,"text":28,"correct":22},"C","单机试运转",{"key":30,"text":31,"correct":32},"D","双机联动试运转",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1253871,"文明施工要求，现场道路设置不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"场区道路设置人行通道，且有标识",{"key":24,"text":41,"correct":22},"临街处设立围挡",{"key":27,"text":43,"correct":22},"所有临时楼梯有扶手和安全护栏",{"key":30,"text":45,"correct":32},"场区道路设置及时救治器具",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1253872,"不属于事故主要原因（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"没有安全规范或不健全",{"key":24,"text":53,"correct":22},"技术和设计上有缺陷",{"key":27,"text":55,"correct":22},"不懂操作技术知识",{"key":30,"text":57,"correct":22},"违反操作规程或劳动纪律",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1253873,"安全检查时主要检查企业的领导和职工对安全生产工作的认识，体现安全检查中（ ）的工作。",[62,64,66,68],{"key":20,"text":63,"correct":32},"查思想",{"key":24,"text":65,"correct":22},"查管理",{"key":27,"text":67,"correct":22},"查隐患",{"key":30,"text":69,"correct":22},"查整改",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1253874,"死亡事故，单位负责人接到报告后，应当于小时内向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告。",[74,76,78,80],{"key":20,"text":75,"correct":32},"1",{"key":24,"text":77,"correct":22},"2",{"key":27,"text":79,"correct":22},"0.5",{"key":30,"text":81,"correct":22},"3",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1253875,"边长或直径在（ ）的洞口，可用混凝土板内钢筋或固定盖板防护。",[86,88,90,92],{"key":20,"text":87,"correct":22},"2.5~20cm",{"key":24,"text":89,"correct":32},"20~50cm",{"key":27,"text":91,"correct":22},"50~150cm",{"key":30,"text":93,"correct":22},"150cm以上",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1253876,"某公司接集团总部指令，组建一支电气作业队去灾区抢修10kV以下的架空输电线路。由A公司技术、安全部门负责组织作业前的动员和培训，除公司领导作动员报告外，技术部门负责人做任务交底和方案交底，安全部门负责人及专业施工员做了作业安全技术交底。并安排全体作业人员进行身体健康检查，对电工登高作业用具及施工机械按规定做试验性检查，保证抢修人员和机具完好程度都处于良好的准备状态，专业施工员特别对立杆、紧线的安全技术要求进行了讲解，由于准备充分、安全措施到位，即使在非常规状态下施工，还是顺利完成了任务。请针对上述情况，回答下列问题。 施工作业人员出发前进行的身体健康检查，以下（ ）人员能够从事高处作业。",[98,100,102,104],{"key":20,"text":99,"correct":22},"高血压",{"key":24,"text":101,"correct":22},"心脏病",{"key":27,"text":103,"correct":22},"恐高症",{"key":30,"text":105,"correct":32},"味觉严重障碍者",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1253877,"高空作业要从（ ）入手加强安全管理。",[110,112,114,116],{"key":20,"text":111,"correct":32},"作业人员的身体健康状况和配备必要的防护设施",{"key":24,"text":113,"correct":22},"完备的操作使用规范",{"key":27,"text":115,"correct":22},"需持证上岗的人员",{"key":30,"text":117,"correct":22},"上岗方案的审定",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1253878,"应急演练可分为（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"地方演练",{"key":24,"text":125,"correct":32},"现场演练",{"key":27,"text":127,"correct":22},"桌面演练",{"key":30,"text":129,"correct":22},"沙盘演练",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1253879,"文明施工要求，施工机具管理不包括（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"手动施工机具和较大的施工机械出库前保养完好并分类整齐排放在室内",{"key":24,"text":137,"correct":22},"机动车辆应停放在规划的停车场内，不应挤占施工通道",{"key":27,"text":139,"correct":32},"手动施工机具和较大的施工机械要有新品作为预防措施",{"key":30,"text":141,"correct":22},"所有施工机械要按规定定期维护保养，保持性能处于完好状态，且外观整洁",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1253880,"不属于事故间接原因（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":32},"机械、物质或环境的不安全状态",{"key":24,"text":149,"correct":22},"没有或不认真实施事故防范措施，对事故隐患整改不力",{"key":27,"text":151,"correct":22},"技术和设计上的缺陷",{"key":30,"text":153,"correct":22},"没有安全规程或不健全",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},1253881,"风险识别的七种类型不包括（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"大气排放",{"key":24,"text":161,"correct":22},"水体排放",{"key":27,"text":163,"correct":22},"固体废物处理",{"key":30,"text":165,"correct":32},"建筑排放物处理",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1253882,"根据施工阶段安全技术措施的要求，单项工程、单位工程均应有安全技术措施，分部分项工程应有安全技术具体措施，施工前由（ ）向参加施工的有关人员进行安全技术交底，签字并归档保存。",[170,172,174,176],{"key":20,"text":171,"correct":32},"技术负责人",{"key":24,"text":173,"correct":22},"项目负责人",{"key":27,"text":175,"correct":22},"质量员",{"key":30,"text":177,"correct":22},"安全员",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1253883,"施工现场发生的噪声、粉尘排放，主要是对环境的（ ）影响较大。",[182,184,186,188],{"key":20,"text":183,"correct":22},"土地污染",{"key":24,"text":185,"correct":32},"人体健康、大气污染",{"key":27,"text":187,"correct":22},"水体污染",{"key":30,"text":189,"correct":22},"资源消耗",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1253884,"在危险源的种类，属于第二种的（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"电能伤害",{"key":24,"text":197,"correct":32},"人的偏离标准要求的不安全行为",{"key":27,"text":199,"correct":22},"热能伤害",{"key":30,"text":195,"correct":22},{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},1253885,"施害物是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"指直接引起中毒的物体或物质",{"key":24,"text":208,"correct":22},"导致事故发生的物体和物质",{"key":27,"text":210,"correct":32},"指直接引起伤害及中毒的物体或物质",{"key":30,"text":212,"correct":22},"导致伤害发生的物体和物质",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":30,"analysis":33},1253886,"风险识别的的三种状态不包括（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"正常状态",{"key":24,"text":220,"correct":22},"异常状态",{"key":27,"text":222,"correct":22},"紧急状态",{"key":30,"text":224,"correct":32},"突然状态",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},1253887,"风险等级一般分为（ ）级",[229,231,233,235],{"key":20,"text":230,"correct":22},"六",{"key":24,"text":232,"correct":32},"五",{"key":27,"text":234,"correct":22},"七",{"key":30,"text":236,"correct":22},"四",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":27,"analysis":33},1253888,"边长或直径在（ ）的洞口，可用混凝土板内钢筋贯穿洞径构成防护网，网格大于20cm时要另外加密。",[241,242,243,244],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":32},{"key":30,"text":93,"correct":22},{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":30,"analysis":33},1253889,"以下不属于安全“四口'，是指（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"楼梯口",{"key":24,"text":252,"correct":22},"电梯井口",{"key":27,"text":254,"correct":22},"预留洞口",{"key":30,"text":256,"correct":32},"门窗洞口",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":30,"analysis":33},1253890,"文明施工要求，现场道路设置：消防通道形成环形，宽度不小于（ ）m。",[261,263,264,266],{"key":20,"text":262,"correct":22},"3.9",{"key":24,"text":81,"correct":22},{"key":27,"text":265,"correct":22},"2.9",{"key":30,"text":267,"correct":32},"3.5",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":20,"analysis":33},1253891,"事故发生后，施工单位事故现场有关人员应立即向本单位负责人报告，负责人接到报告后应立即向上一级主管领导和主管部门报告，并于（ ）小时内将事故情况向事故发生地县级以上人民政府建设主管部门和有关部门报告。",[272,273,274,276],{"key":20,"text":75,"correct":32},{"key":24,"text":77,"correct":22},{"key":27,"text":275,"correct":22},"12",{"key":30,"text":277,"correct":22},"24",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},1253892,"自事故发生之日起（ ）日内，事故造成的伤亡人数发生变化的，应当及时补报。",[282,284,286,288],{"key":20,"text":283,"correct":22},"20",{"key":24,"text":285,"correct":32},"30",{"key":27,"text":287,"correct":22},"14",{"key":30,"text":289,"correct":22},"7",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},1253893,"根据有关规定，在居民密集区进行强噪声施工作业时，夜间作业时间不得超过（ ），施工现场早晨作业时间不得早于6时。",[294,296,298,300],{"key":20,"text":295,"correct":22},"20时",{"key":24,"text":297,"correct":22},"21时",{"key":27,"text":299,"correct":32},"22时",{"key":30,"text":301,"correct":22},"23时",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":24,"analysis":33},1253894,"轻伤事故，在逐级报告的同时，项目部填写“伤亡事故登记表”一式两份，报企业安全管理部门一份，项目部自存一份，通报时间最迟不能晚于事故发生后（ ）小时。",[306,308,309,310],{"key":20,"text":307,"correct":22},"36",{"key":24,"text":277,"correct":32},{"key":27,"text":275,"correct":22},{"key":30,"text":311,"correct":22},"48",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":30,"analysis":33},1253895,"事故原因统计分析表明，70％以上的事故是由“三违”造成的，以下不属于“违”行为的是（ ）。",[316,318,320,322],{"key":20,"text":317,"correct":22},"违章指挥",{"key":24,"text":319,"correct":22},"违章作业",{"key":27,"text":321,"correct":22},"违反劳动纪律",{"key":30,"text":323,"correct":32},"违反职业道德",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":24,"analysis":33},1253896,"某建设工程使用保温棉，净用量为500m3，保温棉的损耗率为3％，则该保温棉的总消耗量为（ ）。",[328,330,332,334],{"key":20,"text":329,"correct":22},"500m3",{"key":24,"text":331,"correct":32},"515m3",{"key":27,"text":333,"correct":22},"501.5m3",{"key":30,"text":335,"correct":22},"550m3",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":27,"analysis":33},1253897,"下列哪些不属于《给排水、采暖、燃气工程》工程量计算规范中钢管清单子目的工作内容（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":22},"压力试验",{"key":24,"text":343,"correct":22},"警示带铺设",{"key":27,"text":345,"correct":32},"管道接口保温",{"key":30,"text":347,"correct":22},"管道安装",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},1253898,"供暖系统一般由（ ）等部分组成。",[352,354,356,358],{"key":20,"text":353,"correct":32},"热源、管道系统、散热设备、辅助设备、循环水泵",{"key":24,"text":355,"correct":22},"热源、管道系统、散热设备、循环水泵",{"key":27,"text":357,"correct":22},"热源、管道系统、辅助设备、循环水泵",{"key":30,"text":359,"correct":22},"管道系统、散热设备、辅助设备、循环水泵",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},1253899,"负责工程量清单编制的是（ ）。",[364,366,368,370],{"key":20,"text":365,"correct":32},"招标人",{"key":24,"text":367,"correct":22},"投标人",{"key":27,"text":369,"correct":22},"业主",{"key":30,"text":371,"correct":22},"施工单位",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":30,"analysis":33},1253900,"我国目前实行的工程量清单计价采用的综合单价是部分费用综合单价，既不完全费用综合单价。单价中未包括措施费、其他项目费、规费和（ ）。",[376,378,380,382],{"key":20,"text":377,"correct":22},"风险费",{"key":24,"text":379,"correct":22},"管理费",{"key":27,"text":381,"correct":22},"利润",{"key":30,"text":383,"correct":32},"税金",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":24,"analysis":33},1253901,"各类通风管道，若整个通风系统设计采用渐缩管均匀送风者，执行相应规格项目，其人工乘以多大的系数（ ）。",[388,389,391,392],{"key":20,"text":77,"correct":22},{"key":24,"text":390,"correct":32},"2.5",{"key":27,"text":81,"correct":22},{"key":30,"text":267,"correct":22},{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":27,"analysis":33},1253902,"背景：某9层综合楼的电气安装工程，电气配管项目人工费为2000元（超过5m人工费为1000元），材料费为5000元，机械使用费为500元。请回答下列问题： 电气工程超高增加费率为33％，管理费率和利润率分别为43％和14％，计算电气配管的超高增加费为（ ）。",[397,399,401,403],{"key":20,"text":398,"correct":22},"330元",{"key":24,"text":400,"correct":22},"660元",{"key":27,"text":402,"correct":32},"518元",{"key":30,"text":404,"correct":22},"1650元",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},1253903,"已知某安装工程，分项分部工程量清单计价1770万元，措施项目清单计价51.34万元，其他项目清单计价100万元，规费80万元，税金68.25万元，则其招标控制价应（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":32},"2069.59万元",{"key":24,"text":412,"correct":22},"1821.43万元",{"key":27,"text":414,"correct":22},"1838.25万元",{"key":30,"text":416,"correct":22},"1950万元",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":24,"analysis":33},1253904,"施工过程中大量的设计变更仍需采用（ ），否则会对竣工结算造成影响。",[421,423,425,427],{"key":20,"text":422,"correct":22},"任一计取工程量",{"key":24,"text":424,"correct":32},"人工计取工程量",{"key":27,"text":426,"correct":22},"计算机计取工程量",{"key":30,"text":428,"correct":22},"混合计取工程量",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":30,"analysis":33},1253905,"在工程量清单计价中，分部分项工程综合单价的组成包括（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":22},"人工费+材料费+施工机械使用费+规费+企业管理费",{"key":24,"text":436,"correct":22},"人工费+材料费+施工机械使用费+税金+企业管理费",{"key":27,"text":438,"correct":22},"人工费+材料费十施工机械使用费+规费一+利润",{"key":30,"text":440,"correct":32},"人工费+材料费+施工机械使用费+利润+企业管理费",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},1253906,"背景：某9层综合楼的电气安装工程，电气配管项目人工费为2000元（超过5m人工费为1000元），材料费为5000元，机械使用费为500元。请回答下列问题： 该电气安装工程类别是（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":22},"一类",{"key":24,"text":448,"correct":32},"二类",{"key":27,"text":450,"correct":22},"三类",{"key":30,"text":452,"correct":22},"四类",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},1253907,"大规格风管是指矩形风管边长大于（ ）的。",[457,459,461,463],{"key":20,"text":458,"correct":32},"2500mm",{"key":24,"text":460,"correct":22},"2400mm",{"key":27,"text":462,"correct":22},"2000mm",{"key":30,"text":464,"correct":22},"1500mm",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},1253908,"下列主要由市场定价的计价模式是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":32},"工程量清单计价",{"key":24,"text":472,"correct":22},"措施项目清单",{"key":27,"text":474,"correct":22},"规费项目清单",{"key":30,"text":476,"correct":22},"税金项目清单",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},1253909,"背景：某9层综合楼的电气安装工程，电气配管项目人工费为2000元（超过5m人工费为1000元），材料费为5000元，机械使用费为500元。请回答下列问题： 若该管理费率和利润率分别按43％和14％计算，计算管理费为（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"430元",{"key":24,"text":484,"correct":32},"860元",{"key":27,"text":486,"correct":22},"2150元",{"key":30,"text":488,"correct":22},"1075元",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":27,"analysis":33},1253910,"设在高层建筑内的供暖热源加压泵间管道的分界点为（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"以泵间外墙皮1.2m处为界",{"key":24,"text":496,"correct":22},"以泵间外墙皮1.5m处为界",{"key":27,"text":498,"correct":32},"以泵间外墙皮为界",{"key":30,"text":500,"correct":22},"泵间人口阀门",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":27,"analysis":33},1253911,"下列关于导线的预留长度计算，正确的是（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"导线进接线盒的预留长度为15-20cm",{"key":24,"text":508,"correct":22},"导线到配电箱的预留长度为配电箱的周长",{"key":27,"text":510,"correct":32},"开关、灯具的预留长度，已综合考虑在定额内，不另行计算",{"key":30,"text":512,"correct":22},"导线进人闸刀开关的预留长度为0.5m",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":24,"analysis":33},1253912,"安装一套单管荧光灯的人工费为50元，材料费（含主材）为100元，机械费为10元，按管理费率和利润率分别为43％和14％，问安装一套单管荧光灯的综合单价为（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":22},"160元",{"key":24,"text":520,"correct":32},"188.5元",{"key":27,"text":522,"correct":22},"186.5元",{"key":30,"text":524,"correct":22},"175.5元",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":27,"analysis":33},1253913,"常见电线型号中，BLV是代表（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"铜芯聚氯乙烯绝缘电线",{"key":24,"text":532,"correct":22},"芯聚氯乙烯绝缘聚氯乙烯护套电线",{"key":27,"text":534,"correct":32},"铝芯聚氯乙烯绝缘电线",{"key":30,"text":536,"correct":22},"铝芯聚氯乙烯绝缘聚氯乙烯护套电线",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},1253914,"大规格风管是指圆形风管直径大于（ ）的。",[541,542,543,544],{"key":20,"text":458,"correct":32},{"key":24,"text":460,"correct":22},{"key":27,"text":462,"correct":22},{"key":30,"text":464,"correct":22},{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":27,"analysis":33},1253915,"工程量清单的组成不包括（ ）。",[549,550,551,553],{"key":20,"text":472,"correct":22},{"key":24,"text":474,"correct":22},{"key":27,"text":552,"correct":32},"分部工程量清单",{"key":30,"text":476,"correct":22},{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":27,"analysis":33},1253916,"各种管道的定额单位为（ ）。",[558,560,562,564],{"key":20,"text":559,"correct":22},"0.1m",{"key":24,"text":561,"correct":22},"1m",{"key":27,"text":563,"correct":32},"10m",{"key":30,"text":565,"correct":22},"100m",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":27,"analysis":33},1253917,"在有害身体健康的环境中施工增加的费用，按人工费的（ ）计算。",[570,572,574,576],{"key":20,"text":571,"correct":22},"8％",{"key":24,"text":573,"correct":22},"9％",{"key":27,"text":575,"correct":32},"10％",{"key":30,"text":577,"correct":22},"11％",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":30,"analysis":33},1253918,"点型探测器按线制的不同分为多线制与总线制两种，点型探测器套用定额时，哪一种说法不正确：（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":22},"不分规格型号",{"key":24,"text":585,"correct":22},"不分安装方式、位置",{"key":27,"text":587,"correct":22},"以个为计算单位",{"key":30,"text":589,"correct":32},"不包括本体调试",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":27,"analysis":33},1253919,"配电柜的外形尺寸为2000（高）×700（长）×350（宽），共2台，落地安装，计算基础槽钢的工程量合计为（ ）。",[594,596,598,600],{"key":20,"text":595,"correct":22},"1.05m",{"key":24,"text":597,"correct":22},"2.1m",{"key":27,"text":599,"correct":32},"4.2m",{"key":30,"text":601,"correct":22},"5.4m",[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]