[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254653":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1254653,838,3,"判断题","间接成本计划反映间接成本的计划数及降低额，在计划制订中，成本项目与会计核算中间接成本项目的内容不一致。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"间接成本计划。主要反映工程项目间接成本的计划数及降低额，在编制计划时，成本项目应与会计核算中间接成本项目的内容一致。",{"id":6,"name":21,"category":22,"favorite":23},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]