[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254649":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1254649,838,3,"判断题","要降低固定成本必须提高管理效率、增加企业承揽的工程量，则单位工程量占有的变动成本就会降低。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"要降低固定成本必须提高管理效率、增加企业承揽的工程量，则单位工程量战友的固定成本就会降低，变动成本的降低要从分项工程的消耗额降低入手。",{"id":6,"name":21,"category":22,"favorite":23},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]