[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254571":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1254571,838,3,"判断题","施工阶段是工程实体的形成阶段，对施工阶段进度进行控制是整个工程项目建设进度控制的重点。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]