[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254548":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1254548,838,3,"判断题","规模较大的分部（分项）工程和专项工程的施工方案要按单位工程施工组织设计进行编制和审批。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]