[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254532":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1254532,838,3,"判断题","由专业承包单位施工的分部（分项）工程或专项工程的施工方案，由专业承包单位技术负责人或技术负责人授权的技术人员审批，有总承包单位时，由总承包单位项目技术负责人核准备案。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]