[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254523":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1254523,838,3,"判断题","室内排水管道工程是施工中，如施工中某段管子需隐蔽的，则该段管子应先进行灌压力试验。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"一般就是打压试验，对于排水管道要做灌水试验，通球试验。",{"id":6,"name":21,"category":22,"favorite":23},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]