[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254507":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1254507,838,3,"判断题","施工段划分必须是固定。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"根据第4章施工组织设计及专项施工方案可知：施工段可以是固定的，也可以是不固定的。",{"id":6,"name":21,"category":22,"favorite":23},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]