[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254400":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254400,838,2,"多选题","通风与空调工程施工质量验收的要求，参与单位工程验收时应提供的资料有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","通风与空调工程的工程质量控制资料",true,{"key":16,"text":17,"correct":14},"B","通风与空调工程的工程安全和功能检验资料及主要功能抽查记录",{"key":19,"text":20,"correct":14},"C","通风与空调工程的工程观感质量检查记录",{"key":22,"text":23,"correct":24},"D","通风与空调工程的工程方案实施过程",false,{"key":26,"text":27,"correct":24},"E","通风与空调工程的工程技术检测","ABC","通风与空调工程施工质量验收的要求，参与单位工程验收时应提供的资料：通风与空调工程的工程质量控制资料；通风与空调工程的工程安全和功能检验资料及主要功能抽查记录；通风与空调工程的工程观感质量检查记录。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]