[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254393":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254393,838,2,"多选题","建筑工程检测的对象为（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","建筑工程",true,{"key":16,"text":17,"correct":14},"B","建筑构件、制品",{"key":19,"text":20,"correct":14},"C","建筑现场所用的有关材料",{"key":22,"text":23,"correct":24},"D","建筑面积",false,{"key":26,"text":27,"correct":24},"E","建筑施工要求","ABC","建筑工程检测的的对象为建筑工程和建筑构件、制品以及建筑现场所用的有关材料和设备。",{"id":6,"name":31,"category":13,"favorite":32},"(设备安装施工)专业管理实务 岗位知识",0]