[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254340":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254340,838,2,"多选题","按照《计价规范》的规定，其他项目费的构成包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","暂列金额",true,{"key":16,"text":17,"correct":14},"B","总承包服务费",{"key":19,"text":20,"correct":14},"C","暂估价",{"key":22,"text":23,"correct":14},"D","计日工",{"key":25,"text":26,"correct":27},"E","间接费用中的其他费",false,"ABCD","按照《计价规范》的规定，其他项目费的构成包括：暂列金额、总承包服务费、暂估价、计日工。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]