[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254292":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254292,838,2,"多选题","工程变更一般包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","设计变更",true,{"key":16,"text":17,"correct":14},"B","进度计划变更",{"key":19,"text":20,"correct":14},"C","施工条件变更",{"key":22,"text":23,"correct":14},"D","技术标准规范变更",{"key":25,"text":26,"correct":27},"E","工程变更",false,"ABCD","工程变更，施工中工程变更是很难避免的，一般包括设计变更、进度计划变更、施工条件变更、技术标准规范变更、工程数量变更等。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]