[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254281":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254281,838,2,"多选题","施工成本分类的方法（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","按成本发生的时间划分",true,{"key":16,"text":17,"correct":14},"B","按生产费用进入成本的方法划",{"key":19,"text":20,"correct":14},"C","按生产费用和工程量的关系划分",{"key":22,"text":23,"correct":24},"D","按生产费用和施工标准划分",false,{"key":26,"text":27,"correct":24},"E","按生产成本","ABC","施工成本分类的方法：按成本发生的时间划分；按生产费用进入成本的方法划分；按生产费用和工程量的关系划分。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]