[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254279":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254279,838,2,"多选题","施工记录要符合（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","规范要求",true,{"key":16,"text":17,"correct":14},"B","现场实际情况",{"key":19,"text":20,"correct":14},"C","专业部位要求",{"key":22,"text":23,"correct":24},"D","施工计划",false,{"key":26,"text":27,"correct":24},"E","施工方案","ABC","施工记录要符合规范要求、现场实际情况、专业部位要求。施工记录间的时间顺序、制约条件和有机联系要相符；安装工程与土建工程之间的交叉配合要相符；总包和分包之间的记录要相符；内容与目录要相符等。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]