[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254267":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254267,838,2,"多选题","关键过程是指（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","施工难度大、过程质量不稳定或出现不合格频率较高的过程",true,{"key":16,"text":17,"correct":14},"B","对产品质量特性有较大影响的过程",{"key":19,"text":20,"correct":14},"C","施工周期长，原材料昂贵，出现不合格品后经济损失较大的过程",{"key":22,"text":23,"correct":14},"D","基于人员素质、施工环境等方面的考虑，认为比较重要的其他过程",{"key":25,"text":26,"correct":27},"E","项目主要环节的施工过程",false,"ABCD","关键过程：施工难度大、过程质量不稳定或出现不合格频率较高的过程；对产品质量特性有较大影响的过程；施工周期长，原材料昂贵，出现不合格品后经济损失较大的过程；基于人员素质、施工环境等方面的考虑，认为比较重要的其他过程。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]