[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254252":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254252,838,2,"多选题","风管就位时，风管、部件、风阀等的排序应符合设计要求与自行测绘编制的草图，注意（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","风口大小",false,{"key":16,"text":17,"correct":18},"B","核对标高和与建筑物的距离",true,{"key":20,"text":21,"correct":18},"C","控制走向误差",{"key":23,"text":24,"correct":14},"D","风量控制",{"key":26,"text":27,"correct":18},"E","风口位置","BCE","风管就位时，风管、部件、风阀等的排序应符合设计要求与自行测绘编制的草图，注意风口位置、核对标高和建筑物的距离、控制走向误差。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]