[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254244":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254244,838,2,"多选题","案例一从背景分析项目部质量策划达到哪些（ ）目的。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","质量策划有效",true,{"key":16,"text":17,"correct":14},"B","质量目标和组织结构有明显的成果",{"key":19,"text":20,"correct":14},"C","落实责任和编制具有可操控性的质量计划有明显的成果",{"key":22,"text":23,"correct":14},"D","完善质量管理体系有明显的成果",{"key":25,"text":26,"correct":27},"E","更换应用设备",false,"ABCD","项目部的质量策划有效，在质量目标、组织结构、落实责任、编制具有可操作性的质量计划和完善质量管理体系等各方面都有有明显的成果。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]