[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254233":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254233,838,2,"多选题","项目技术交底的层级，分为三个层次：（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","施工组织设计的交底",true,{"key":16,"text":17,"correct":14},"B","施工方案的交底",{"key":19,"text":20,"correct":21},"C","单位工程交底",false,{"key":23,"text":24,"correct":21},"D","分部工程交底",{"key":26,"text":27,"correct":14},"E","分项工程交底","ABE","项目技术交底的层级，分为三个层次：施工组织设计的交底、施工方案的交底、分项工程交底。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]