[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254231":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254231,838,2,"多选题","图纸变更的原因可能有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","设计单位发现原设计不妥主动提出变更",true,{"key":16,"text":17,"correct":14},"B","业主或用户依据需要的变化提出变更",{"key":19,"text":20,"correct":14},"C","施工单位发现施工有问题而提出变更",{"key":22,"text":23,"correct":24},"D","图纸不符合相关规范要求",false,{"key":26,"text":27,"correct":24},"E","气候的变化引起的变动","ABC","图纸变更的原因可能有三种情况。一是设计单位发现原设计不妥主动提出变更，二是业主或用户依据需要的变化提出变更，三是施工单位发现施工有问题而提出变更。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]