[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254209":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254209,838,2,"多选题","影响工程进度管理的因素主要有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","业主",true,{"key":16,"text":17,"correct":14},"B","勘察设计单位",{"key":19,"text":20,"correct":14},"C","承包人",{"key":22,"text":23,"correct":24},"D","供应商",false,{"key":26,"text":27,"correct":14},"E","建设环境","ABCE","影响工程进度管理的因素主要有：业主、勘察设计单位、承包人、建设环境。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]