[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254186":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},1254186,838,2,"多选题","主要施工管理计划包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","绿色施工管理计划",false,{"key":16,"text":17,"correct":18},"B","质量管理计划",true,{"key":20,"text":21,"correct":18},"C","安全管理计划",{"key":23,"text":24,"correct":14},"D","防火保安管理计划",{"key":26,"text":21,"correct":14},"E","BC","主要施工管理计划包括进度管理计划、质量管理计划、安全管理计划、环境管理计划、成本管理计划以及其他管理计划。",{"id":6,"name":30,"category":31,"favorite":32},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]