[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254174":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254174,838,2,"多选题","主要的施工方法包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","主要施工机械的选配、季节性施工的步骤",true,{"key":16,"text":17,"correct":14},"B","防台防雨措施、构件配件的加工订货",{"key":19,"text":20,"correct":14},"C","重要分项工程施工工艺及工序的确定",{"key":22,"text":23,"correct":14},"D","样板区的选定",{"key":25,"text":26,"correct":27},"E","重要分部工程施工工艺及工序的确定",false,"ABCD","主要的施工方法包括主要施工机械的选配、季节性施工的步骤和防台防雨措施、构件配件的加工订货或自行制作的选定、重要分项工程施工工艺及工序的确定，以及样板区的选定。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]