[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254160":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1254160,838,2,"多选题","专项施工方案的内容（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","工程概况",true,{"key":16,"text":17,"correct":14},"B","明确各类资源配置数量和要求",{"key":19,"text":20,"correct":21},"C","编制组分工，并明确初稿完成时间",false,{"key":23,"text":24,"correct":21},"D","工程施工合同、招标投标文件或相关文件",{"key":26,"text":27,"correct":21},"E","新工艺的分部或分项工程","AB","专项施工方案的内容：工程概况；明确各类资源配置数量和要求等。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]