[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254087":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1254087,838,1,"单选题","给水排水系统原理图以平面图（ ）为起点，顺时针自左向右按编号依次顺序排列。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","左端支管",false,{"key":16,"text":17,"correct":14},"B","右端支管",{"key":19,"text":20,"correct":21},"C","左端立管",true,{"key":23,"text":24,"correct":14},"D","右端立管","给水排水系统原理图以平面图左端立管为起点，顺时针自左向右按编号依次顺序排列。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]