[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253991":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1253991,838,1,"单选题","各项调整措施、意见、改进的办法和方案是（ ）信息。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","计划信息",false,{"key":16,"text":17,"correct":14},"B","执行信息",{"key":19,"text":20,"correct":14},"C","检查信息",{"key":22,"text":23,"correct":24},"D","反馈信息",true,"根据第11章工程信息资料处理可知：各项调整措施、意见、改进的办法和方案是反馈信息。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]