[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253982":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1253982,838,1,"单选题","施工项目信息按信息的稳定程度分类分为固定信息和（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","执行信息",false,{"key":16,"text":17,"correct":14},"B","静态信息",{"key":19,"text":20,"correct":14},"C","动态信息",{"key":22,"text":23,"correct":24},"D","流动信息",true,"施工项目信息按信息的稳定程度分类分为固定信息和流动信息。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]