[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253958":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1253958,838,1,"单选题","（ ），由项目部技术负责人向全体员工进行交底。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程项目开工前",true,{"key":16,"text":17,"correct":18},"B","工程项目开工后",false,{"key":20,"text":21,"correct":18},"C","单位施工开工前",{"key":23,"text":24,"correct":18},"D","单位施工开工后","工程项目开工前，由项目部技术负责人向全体员工进行交底，内容包括工程概况、施工方法、主要安全技术措施等。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]