[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253954":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1253954,838,1,"单选题","施工现场停止作业（ ）时，应将动力开关箱断电上锁。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","二小时以上",false,{"key":16,"text":17,"correct":14},"B","三小时以上",{"key":19,"text":20,"correct":21},"C","一小时以上",true,{"key":23,"text":24,"correct":14},"D","半小时以上","施工现场停止作业一小时以上时，应将动力开关箱断电上锁。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]