[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253938":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1253938,838,1,"单选题","以下哪个不是项目技术交底的层级（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工组织设计的交底",false,{"key":16,"text":17,"correct":14},"B","施工方案的交底",{"key":19,"text":20,"correct":14},"C","分项交底",{"key":22,"text":23,"correct":24},"D","分部工程交底",true,"项目技术交底的层级：施工组织设计的交底、施工方案的交底、分项交底。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]