[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253915":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1253915,838,1,"单选题","工程量清单的组成不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","措施项目清单",false,{"key":16,"text":17,"correct":14},"B","规费项目清单",{"key":19,"text":20,"correct":21},"C","分部工程量清单",true,{"key":23,"text":24,"correct":14},"D","税金项目清单","工程量清单的组成包括：措施项目清单、规费项目清单、税金项目清单。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]