[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253839":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1253839,838,1,"单选题","施工措施费目标成本的编制，以施工图预算其他直接费为收人依据，按施工方案和施工现场条件，预计（ ）、场地清理费、检验试验费、生产工具用具费、标准化与文明施工等发生的各项费用。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","二次搬运费",false,{"key":16,"text":17,"correct":14},"B","现场水电费",{"key":19,"text":20,"correct":14},"C","场地租借费",{"key":22,"text":23,"correct":24},"D","ABC",true,"施工措施费目标成本的编制，以施工图预算其他直接费为收人依据，按施工方案和施工现场条件，预计二次搬运费、现场水电费、场地租借费、场地清理费、检验试验费、生产工具用具费、标准化与文明施工等发生的各项费用。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]