[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253817":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1253817,838,1,"单选题","计划成本是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","又称项目承包成本，其加上项目企业期望利润后，即为项目经理的责任成本目标值",false,{"key":16,"text":17,"correct":14},"B","指施工过程中耗费的为构成工程实体或有助于过程工程实体形成的各项费用支出的和",{"key":19,"text":20,"correct":14},"C","施工项目承建所承包工程实际发生的各项生产费用的总和",{"key":22,"text":23,"correct":24},"D","项目经理在承包成本扣除预期成本计划降低额后的成本额",true,"计划成本是项目经理在承包成本扣除预期成本计划降低额后的成本额。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]