[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253805":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1253805,838,1,"单选题","某医院医技综合楼机电总承包工程，具体工作范围包括给排水、电气、暖通空调、消防、智能、净化、医疗气体工程。大楼管线系统复杂，质量要求高，项目部为搞好工程质量，保证施工进度安全等各项指标的实现，在项目开工前进行了详细的质量策划、制定质量控制点、组织质量交底、技术交底，有效实现了项目的各项指标。根据背景资料，回答下列问题。 通过施工质量策划形成的施工质量计划等同于（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","技术方案",false,{"key":16,"text":17,"correct":14},"B","质量方案",{"key":19,"text":20,"correct":14},"C","施工方案",{"key":22,"text":23,"correct":24},"D","施工组织设计",true,"通过施工质量策划形成的施工质量计划等同于施工组织设计。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]