[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253800":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1253800,838,1,"单选题","按照工程重要程度，单位工程开工前，应由企业或项目技术负责人组织全面的",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","组织管理",false,{"key":16,"text":17,"correct":14},"B","责任分工",{"key":19,"text":20,"correct":14},"C","进度安排",{"key":22,"text":23,"correct":24},"D","技术交底",true,"按照工程重要程度，单位工程开工前，应由企业或项目技术负责人组织全面的技术交底。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]