[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253798":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1253798,838,1,"单选题","做好通风空调工程的调试试运转事故方案并实施是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","事前阶段质量控制",false,{"key":16,"text":17,"correct":14},"B","事中阶段质量控制",{"key":19,"text":20,"correct":21},"C","事后阶段质量控制",true,{"key":23,"text":24,"correct":14},"D","事前阶段管理控制","做好通风空调工程的调试试运转事故方案并实施是事后质量控制。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]