[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253753":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1253753,838,1,"单选题","分部分项工程开工前，（ ）应组织施工员（专业工程师）编制工程质量通病预防措施，质量预防措施可单独编制，也可编制在施工组织设计或施工方案里。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目总工程师",true,{"key":16,"text":17,"correct":18},"B","方案编制人",false,{"key":20,"text":21,"correct":18},"C","质量检查员",{"key":23,"text":24,"correct":18},"D","分包单位施工人员","分部分项工程开工前，项目总工程师应组织施工员（专业工程师）编制工程质量通病预防措施，质量预防措施可单独编制，也可编制在施工组织设计或施工方案里。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]