[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253749":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1253749,838,1,"单选题","施工项目质量计划的主要内容不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","质量目标",false,{"key":16,"text":17,"correct":14},"B","组织机构",{"key":19,"text":20,"correct":21},"C","主要施工方案",true,{"key":23,"text":24,"correct":14},"D","质量保证体系","施工项目质量计划的主要内容包括：质量目标、组织机构、质量保证体系。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]