[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253721":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1253721,838,1,"单选题","工序的质量控制是（ ）质量控制的重点。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","设计阶段",false,{"key":16,"text":17,"correct":14},"B","施工准备阶段",{"key":19,"text":20,"correct":21},"C","施工阶段",true,{"key":23,"text":24,"correct":14},"D","竣工验收阶段","工序的质量控制是施工阶段质量控制的重点。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]