[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253717":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1253717,838,1,"单选题","施工记录间的时间顺序、制约条件和（ ）要相符。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","有机联系",true,{"key":16,"text":17,"correct":18},"B","土建工程之间的交叉配合",false,{"key":20,"text":21,"correct":18},"C","目录",{"key":23,"text":24,"correct":18},"D","分包之间的记录","施工记录要符合规范要求、现场实际情况、专业部位要求。施工记录间的时间顺序、制约条件和有机联系要相符；安装工程与土建工程之间的交叉配合要相符；总包和分包之间的记录要相符；内容与目录要相符等。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]