[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253674":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1253674,838,1,"单选题","项目部负责人的介绍说明了（ ）对影响工程质量的因素进行控制。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","人、机、料、法、环",true,{"key":16,"text":17,"correct":18},"B","料、法、环",false,{"key":20,"text":21,"correct":18},"C","机、料、法、环",{"key":23,"text":24,"correct":18},"D","法、环","项目部负责人的经验介绍及人员培训。采用新仪器带动施工方法的应用，对材料采购和验收加强管理，做好成品保护改善环境条件等，实施了人、机、料、法、环全方位控制。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]