[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253672":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1253672,838,1,"单选题","分部工程的验收应由（ ）组织施工单位项目负责人和技术、质量负责人等进行验收",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","监理工程师",false,{"key":16,"text":17,"correct":14},"B","总包技术负责任人",{"key":19,"text":20,"correct":14},"C","总包项目经理",{"key":22,"text":23,"correct":24},"D","总监理工程师",true,"分部工程的验收应由总监理工程师组织施工单位项目负责人和技术、质量负责人等进行验收",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]