[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253641":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1253641,838,1,"单选题","勘察设计目标的确定、可投人的力量及其工作效率、各专业设计的配合，以及业主和设计单位的配合等影响进度管理的因素属于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","业主",false,{"key":16,"text":17,"correct":18},"B","勘察设计单位",true,{"key":20,"text":21,"correct":14},"C","承包人",{"key":23,"text":24,"correct":14},"D","建设环境","勘察设计目标的确定、可投人的力量及其工作效率、各专业设计的配合，以及业主和设计单位的配合等影响进度管理的因素属于勘察设计单位。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]