[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253570":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1253570,838,1,"单选题","重点、难点分部不（方向）工程和专项工程施工方案由施工单位技术部门组织有关专家评审，（ ）批准。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工单位负责人",false,{"key":16,"text":17,"correct":18},"B","施工单位技术负责人",true,{"key":20,"text":21,"correct":14},"C","项目负责人",{"key":23,"text":24,"correct":14},"D","项目技术负责人","重点、难点分部不（方向）工程和专项工程施工方案由施工单位技术部门组织有关专家评审，施工单位技术负责人批准。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]