[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253546":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1253546,838,1,"单选题","下列施工组织方法中，属于不常用的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","依次施工",false,{"key":16,"text":17,"correct":14},"B","平行施工",{"key":19,"text":20,"correct":14},"C","流水施工",{"key":22,"text":23,"correct":24},"D","间断施工",true,"根据第4章施工组织设计及专项施工方案可知：施工组织方法常用的有：依次施工、平行施工、流水施工。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]