[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253545":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1253545,838,1,"单选题","如施工中某段管子需隐蔽的，则该段管子应先进行（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","灌水试验和通球试验",true,{"key":16,"text":17,"correct":18},"B","通气试验和通球试验",false,{"key":20,"text":21,"correct":18},"C","灌水试验和通气试验",{"key":23,"text":24,"correct":18},"D","密闭试验和通球试验","如施工中某段管子需隐蔽的，则该段管子应先进行灌水试验和通球试验。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]