[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253539":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1253539,838,1,"单选题","建筑给排水工程中，（ ）是在立管、支管的安装过程中交叉进行的。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","阀门安装",true,{"key":16,"text":17,"correct":18},"B","洁具安装",false,{"key":20,"text":21,"correct":18},"C","地漏安装",{"key":23,"text":24,"correct":18},"D","水泵安装","建筑给排水工程中，阀门安装是在立管、支管的安装过程中交叉进行的。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]