[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253532":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1253532,838,1,"单选题","母线槽沿墙水平安装高度应符合设计要求，设计无要求时距地不应小于（ ），母线应可靠固定在支架上。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1.8m",false,{"key":16,"text":17,"correct":14},"B","2.0m",{"key":19,"text":20,"correct":21},"C","2.2m",true,{"key":23,"text":24,"correct":14},"D","2.4m","母线槽沿墙水平安装高度应符合设计要求，设计无要求时距地不应小于2.2m，母线应可靠固定在支架上。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]